English

Designing Active Operation in Low-Voltage Distribution Grids: Requirements, Interfaces and Roadmap

Systems and Control 2026-04-23 v1 Systems and Control

Abstract

This paper outlines a pathway towards active operation of lowvoltage distribution grids. In these grids, the growing deployment of distributed generation, controllable demand and storage, together with the roll-out of intelligent metering systems, creates new requirements and opportunities for distribution system operators. On the basis of the German and European regulation, and in particular of recent directives enabling grid-oriented interventions and market-based procurement of flexibility, the paper identifies three key pillars for active low-voltage operation: (a) measurement placement and observability, (b) secure and interoperable information and communication architectures and interfaces, and (c) integration of market-based and gridoriented optimisation for controlling connected assets. A structured system overview is developed that specifies main actors and data flows, highlighting central research topics across these pillars. Building on this, a four-phase roadmap is presented, spanning requirements and use-case definition, method development and simulation, laboratory and field validation, and roll-out with system-level feedback, thus providing guidance for distribution system operators and researchers.

Keywords

Cite

@article{arxiv.2604.20530,
  title  = {Designing Active Operation in Low-Voltage Distribution Grids: Requirements, Interfaces and Roadmap},
  author = {Eric Tönges and Andrea Schoen and Frank Marten and Marco Pau and Denis Mende},
  journal= {arXiv preprint arXiv:2604.20530},
  year   = {2026}
}

Comments

This paper is a preprint of a paper accepted by the CIRED 2026 Brussels Workshop and is subject to Institution of Engineering and Technology Copyright. When the final version is published, the copy of record will be available at IET Digital Library

R2 v1 2026-07-01T12:30:22.259Z