Related papers: Timing System of SPring-8 Booster Synchrotron
A timing system provides high-precision signals to allow the controls over a variety of hardware and software components in the accelerator complex. This is guaranteed by the radio frequency (RF) and trigger signal synchronization for…
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…
The dipole mode synchrotron frequency is a basic beam parameter; it and a few similarly basic quantities measured at small time intervals serve to characterize the longitudinal beam dynamics throughout the acceleration cycle. The effective…
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and…
For the future intensity increase of the fixed-target beams in the CERN accelerator complex, a barrier-bucket scheme has been developed to reduce the beam loss during the 5-turn extraction from the PS towards the SPS, the so-called…
It is important to have experimental methods to estimate the maximum beam intensity for the Fermilab Booster as objective input into long term program commitments. An important existing limit is set by the available rf power. This limit is…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
It is well known that timing jitter can degrade the bit error rate (BER) of receivers that recover the clock from input data. However, timing jitter can also result in an indefinite increase in the settling time of clock recovery circuits,…
A research complex for aerospace radiation effects research has been proposed in Harbin Institute of Technology. Its core part is a proton accelerator complex, which consists of a 10 MeV injector, a 300 MeV synchrotron and beam transport…
A longitudinal beam properties, data acquisition system has been commissioned to operate in the Fermilab booster ring. This system captures real time information including beam synchronous phase, bunch length, and coupled bunch instability…
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The…
The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main…
Two barrier RF systems were fabricated, tested and installed in the Fermilab Main Injector. Each can provide 8 kV rectangular pulses (the RF barriers) at 90 kHz. When a stationary barrier is combined with a moving barrier, injected beams…
Slow extraction of beam from synchrotrons or storage rings as required by many fixed target experiments is performed by controlled excitation and feeding of a structural lattice resonance. Due to the sensitive nature of this resonant…
The Booster Operation Optimization Sequential Time-series for Regression (BOOSTR) dataset was created to provide a cycle-by-cycle time series of readings and settings from instruments and controllable devices of the Booster, Fermilab's…
A precise synchronization between laser pulse and electron beam arrival time is essential for achieving sub-picosecond stability in modern accelerator facilities. In this work, a Low-Level RF system architecture combined with White Rabbit…
Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV proton Fermilab Booster. Here we report the results of comprehensive experimental studies of various beam intensity…
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
A laser-Compton backscattering beam, which we call a `Laser-Electron Photon' beam, was upgraded at the LEPS beamline of SPring-8. We accomplished the gains in backscattered photon beam intensities by factors of 1.5--1.8 with the injection…