Related papers: Beam Switching and Beam Feedback Systems at KEKB L…
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and…
Beam injections to KEKB and Photon Factory are performed with pulse-to-pulse modulation at 50 Hz. Three very different beams are switched every 20 ms in order to inject those beams into KEKB HER, LER and Photon Factory (PF) simultaneously.…
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch…
KEK-ATF is studying low emittance, multi-bunch electron beam for the future linear collider. The energy instability of the 1.5 GeV linac has been a problem making the beam injection to the damping ring unstable. Because the unstable beam…
The new method to stabilize the beam energy of the KEK 40MeV proton linac, is developed now. In this method, the signal of the velocity monitor installed upstream the debuncher in the 40MeV beam line, is processed and then fed to the phase…
In order to ensure the beam quality and meet the requirements introduced by the BEPCII storage ring, the beam energy feedback system has been developed at the exit of the linac. This paper describes the implementation and commissioning of…
KEKB completed all of the technical milestones, and had offered important insights into the flavor structure of elementary particles, especially the CP violation. The accelerator control system at KEKB and injector linac was initiated by a…
The electron and positron accelerator complex at KEK offers unique experimental opportunities in the fields of elementary particle physics with SuperKEKB collider and photon science with two light sources. In order to maximize the…
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…
The main `bottleneck' limiting the beam power in circular machines is caused by space charge effects that produce beam instabilities. To increase maximally the beam power of a `proton driver', it is proposed to build a facility consisting…
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total…
In current accelerators, numerous parameters and monitored values are to be adjusted and evaluated, respectively. In addition, fine adjustments are required to achieve the target performance. Therefore, the conventional…
Recording changes in beam transverse positions re-ported by Beam Position Monitors (BPMs) in response to a beam deflection by an upstream dipole corrector (orbit response) is a powerful tool for analysis of accelerator optics and assisting…
The conception of High Power Linac developed in Russian accelerator centres is based on the use of independently phased SC resonators with quadrupole lenses between them. The type and parameters of the resonators as well as focusing…
Electromagnetic modeling with MAFIA of the combined beam position-phase monitors (BPPMs) for the Spallation Neutron Source (SNS) linac has been performed. Time-domain 3-D simulations are used to compute the signal amplitudes and phases on…
The China spallation neutron source (CSNS) linac is designed with beam energy of 81MeV and a peak current of 15mA in the first phase. The RF power system for the 81 MeV Linac requires 8 units of RF power sources, each unit has one…
A timing system provides high-precision signals to allow the controls over a variety of hardware and software components in the accelerator complex. This is guaranteed by the radio frequency (RF) and trigger signal synchronization for…
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel,…
The Fermilab Linac delivers 400 MeV H- beam to the rest of the accelerator chain. Providing stable intensity, energy, and emittance is key since it directly affects downstream machines. To operate high current beam, accelerators must…
We present the design and preliminary results of a prototype beam-based digital feedback system for the Interaction Point of the International Linear Collider. A custom analogue front-end processor, FPGA-based digital signal processing…