Related papers: The Main Injector Particle Physics Experiment (MIP…
The Main Injector Particle Production (MIPP) experiment is a fixed target hadron production experiment at Fermilab. It measures particle production in interactions of 120 GeV/c primary protons from the Main Injector and secondary beams of…
We describe the physics capabilites and status of the MIPP experiment which is scheduled to enter its physics data taking period during December 2004-July 2005. We show some of the results obtained from the engineering run that concluded in…
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…
The fixed-target MIPP experiment, Fermilab E907, was designed to measure the production of hadrons from the collisions of hadrons of momenta ranging from 5 to 120 GeV/c on a variety of nuclei. These data will generally improve the…
From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…
The purpose of the MIPP experiment is to study the inclusive production of photons, pions, kaons and nucleons in pi, K and p interactions on various targets using beams from the Main Injector at Fermilab. The function of the calorimeters is…
Fermilab has been working with the international particle physics and nuclear physics communities to explore and develop research programs possible with a new high intensity proton source known as "Project-X". Project X will provide…
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC…
The MIPP experiment operating with an upgraded data acquisition system will be capable of acquiring data at the rate of 3000 events per second. Currently we are limited to a rate of 30 Hz due to the bottlenecks in the data acquisition…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…
The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interctions. The MIPP TPC is the largest…
From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
With the planned turn-on of the PIP-II 800 MeV superconducting proton linac, Fermilab will potentially become the world's best laboratory at which to carry out fundamental muon measurements, sensitive searches for symmetry violation, and…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is due to begin operations in late 2004. NuMI will deliver an intense muon neutrino beam of variable energy 2-20 GeV directed into the Earth at 58 mrad for short (~1 km) and…
Fermilab's Integrable Optics Test Accelerator is an electron storage ring designed for testing advanced accelerator physics concepts, including implementation of nonlinear integrable beam optics and experiments on optical stochastic…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is under construction and due to begin operations in late 2004. NuMI will deliver an intense $\nu_{\mu}$ beam of variable energy 2-20 GeV directed into the Earth at 58 mrad.…