Related papers: Fermilab Collider Run II: Accelerator Status and U…
The performance of the Tevatron collider demonstrated continuous growth over the course of Run II, with the peak luminosity reaching 4\times1032 cm-2 s-1, and the weekly integration rate exceeding 70 pb-1. This report presents a review of…
The use of existing Fermilab facilities to provide beams for two muon experiments -- the Muon to Electron Conversion Experiment (Mu2e) and the New g-2 Experiment -- is under consideration. Plans are being pursued to perform these…
The CMS Level-1 calorimeter trigger is being upgraded in two stages to maintain performance as the LHC increases pile-up and instantaneous luminosity in its second run. In the first stage, improved algorithms including event-by-event…
The LHCb experiment is running at the Large Hadron Collider to study CP violation and rare decays in the beauty and charm sectors. The physics potential is given for five key observables sensitive to new physics in nominal conditions. The…
Fermilab's hadron physics research continues in all its accelerator-based programs. These efforts will be identified, and the optimization of the Fermilab schedules for physics will be described. In addition to the immediate plans, the…
The LHC in Geneva is already operating at a total energy of $7 TeV$ and hopefully after a pause in 2012, it will attain its full capacity of $14 TeV$ in 2013. These are the highest energies achieved todate in any accelerator. It is against…
In response to a request from the CERN Scientific Policy Committee (SPC), the machine parameters and expected luminosity performance for several proposed post-LHC collider projects at CERN are compiled: three types of hadron colliders…
The Collider Detector at Fermilab (CDF) records proton-antiproton collisions at center of mass energy of 2.0 TeV at the Tevatron collider. A new collider run, Run II, of the Tevatron started in April 2001. Increased luminosity will result…
In January 2007 the CERN director general announced the plan for the staged upgrade of the LHC luminosity. The plan foresees a phase 1 upgrade reaching a peak luminosity of $3 \times 10^{34}$ cm$^{-2}$s$^{-1}$ followed by phase reaching up…
After the observation of a Higgs boson near 125 GeV, the high energy physics community is investigating possible next steps for entering into a new era in particle physics. It is planned that the Large Hadron Collider will deliver an…
After the first successful LHC run in 2010-2012, plans are actively advancing for a series of upgrades leading eventually to about above times the design-luminosity in about ten years. The larger luminosity will allow to perform precise…
The Tevatron in Collider Run II (2001-present) is operating with six times more bunches and many times higher beam intensities and luminosities than in Run I (1992-1995). Beam diagnostics were crucial for the machine start-up and the…
At the end of the Large Hadron Collider's Run 2, CERN's Proton Injector Linac 2, commissioned in 1978, delivered its final beam in December 2018. For Run 3, from March 2021, a new H$^{-}$ will take over the role: Linac4. The machine has…
We present results on top quark physics from the CDF and D0 collaborations at the Fermilab Tevatron proton anti-proton collider. These include legacy results from Run II that were published or submitted for publication before mid-2014, as…
Run II at the Tevatron Collider started at the beginning of March 2001. With extensive upgrades on both detectors and electronics the CDF II began to collect data. This paper reviews early Run II physics results obtained by analyzing data…
Heavy-ion collisions will enter a new era with the start of the CERN Large Hadron Collider (LHC). A first short run with proton-proton collisions at the injection energy of 0.9 TeV will be followed by a longer one with $pp$ collisions at 10…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
With the LHC successfully collecting data at 7 TeV, plans are actively advancing for a series of upgrades leading eventually to about five times the LHC design-luminosity some 10-years from now in the High-Luminosity LHC (HL-LHC) project.…
High energy particle colliders have been in the forefront of particle physics for more than three decades. At present the near term US, European and international strategies of the particle physics community are centered on full…
Run II of the Tevatron Collider is reviewed, emphasizing operations through March 15, 2004. The Run II Luminosity Upgrade plans and luminosity projections through 2009 are discussed.