Related papers: Recent D0 Results at Run II
A review of some of the most important QCD results from Run 1 is presented, together with first preliminary Run 2 measurements (based on the very first data collected by the experiment) and future prospects as the integrated luminosity…
After many upgrades to the CDF detector and to the accelerator complex, Run II began in April 2001. The new detector has improved capabilities for charm physics, and first results from the analysis of early Tevatron Run II data are reported…
As first Run II data acquisition has begun, it is useful to expose the pending questions by reviewing some of the most recent results obtained with Run I data analyses. Early results of the current data taking and middle-term prospects are…
Increasing luminosity at the Fermilab Tevatron collider has led the D0 collaboration to make improvements to its detector beyond those already in place for Run IIa, which began in March 2001. One of the cornerstones of this Run IIb upgrade…
The D0 detector at Fermilab is in the final stages of an extensive upgrade. It is designed to meet the demands imposed by high luminosity Tevatron running planned to begin March 2001. The design and performance of the detector subsystems…
The Tevatron in Collider Run II (2001-present) is operating with six times more bunches and many times higher beam intensities and luminosities than in Run I (1992-1995). Beam diagnostics were crucial for the machine start-up and the…
We describe the design, construction and performance of the upgraded DO muon system for Run II of the Fermilab Tevatron collider. Significant improvements have been made to the major subsystems of the DO muon detector: trigger scintillation…
Recently the peak luminosity achieved on the DA{\Phi}NE collider has been improved by almost a factor three by implementing a novel collision scheme based on large Piwinski angle and Crab-Waist. This encouraging result opened new…
Over the next 6 years the CDF and D0 collaborations have the goal of collecting 15 fb-1 of data in collider Run II. This will require a number of ambitious upgrades to the Fermilab accelerator complex, some of which have been completed,…
Run 2 at the Tevatron started in spring 2001. CDF and D0 are taking data at a center-of-mass energy of 1.96 TeV. First results on searches for phenomena beyond the Standard Model are presented. In January 2003, the integrated luminosity…
The Advanced Laser Interferometer Gravitational-wave Observatory (LIGO) detectors have completed their initial upgrade phase and will enter the first observing run in late 2015, with detector sensitivity expected to improve in future runs.…
We review the diffractive measurements made by the CDF and D\O\ collaborations during Run I at the Tevatron and summarize the detector upgrades relevant for the Run II diffractive physics program.
Many physics topics to be studied by the D0 experiment during Run II of the Fermilab Tevatron ppbar collider give rise to final states containing b--flavored particles. Examples include Higgs searches, top quark production and decay…
The Muon g-2 experiment at Fermilab has published the first result on Run-1 dataset in 2021 showing a good agreement with the previous experimental result at Brookhaven National Laboratory at comparable precision (0.46 ppm). In August 2023…
The LHCb detector optimised its performance in Runs~1 and~2 by stabilising the instantaneous luminosity during a fill. This was achieved by tuning the distance between the two colliding beams according to the measurement of instantaneous…
The goal of the KLOE-2 experiment operating at the upgraded DA{\Phi}NE e+e-collider is to collect an integrated luminosity of about 20 fb-1 during 3-4 years of running. Measurements using the KLOE-2 apparatus equipped with the inner…
A detailed description of an original method used to measure the luminosity accumulated by the HERA-B experiment for a data sample taken during the 2002-2003 HERA running period is reported. We show that, with this method, a total…
The luminosity in the ZEUS detector was measured using photons from electron bremsstrahlung. In 2001 the HERA collider was upgraded for operation at higher luminosity. At the same time the luminosity-measuring system of the ZEUS experiment…
Run II of the Tevatron Collider is reviewed, emphasizing operations through March 15, 2004. The Run II Luminosity Upgrade plans and luminosity projections through 2009 are discussed.
The Run II physics programme of the Tevatron is proceeding with more than 300 pb-1 of analysis quality data, collected at a centre-of-mass energy of 1.96 TeV. Searches for supersymmetric particles are starting to set new limits, improving…