We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
This paper presents a novel idea for the general case of the Common Due-Date (CDD) scheduling problem. The problem is about scheduling a certain number of jobs on a single or parallel machines where all the jobs possess different processing…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
We study the computational complexity of scheduling jobs on a single speed-scalable processor with the objective of capturing the trade-off between the (weighted) flow time and the energy consumption. This trade-off has been extensively…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
Given n jobs with release dates, deadlines and processing times we consider the problem of scheduling them on m parallel machines so as to minimize the total energy consumed. Machines can enter a sleep state and they consume no energy in…
We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…
The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…
This paper presents different methods for solving parallel machine scheduling problems with precedence constraints and setup times between the jobs. Limited discrepancy search methods mixed with local search principles, dominance conditions…
Various new scheduling problems have been arising from practical production processes and spawning new research areas in the scheduling field. We study the parallel multi-stage open shops problem, which generalizes the classic open shop…
We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…
The non-preemptive job scheduling problem with release times and deadlines on a single machine is fundamental to many scheduling problems. We parameterize this problem by the set of job lengths the jobs can have. The case where all job…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
Consider the problem in which n jobs that are classified into k types are to be scheduled on m identical machines without preemption. A machine requires a proper setup taking s time units before processing jobs of a given type. The…