Related papers: Preemptive Scheduling of Equal-Length Jobs to Maxi…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…
We consider the following general scheduling problem: The input consists of n jobs, each with an arbitrary release time, size, and a monotone function specifying the cost incurred when the job is completed at a particular time. The…
We study the shared processor scheduling problem with a single shared processor where a unit time saving (weight) obtained by processing a job on the shared processor depends on the job. A polynomial-time optimization algorithm has been…
We propose a Boolean Linear Programming model for the preemptive single machine scheduling problem with equal processing times, arbitrary release dates and weights(priorities) minimizing the total weighted completion time. Almost always an…
We revisit a classical scheduling model to incorporate modern trends in data center networks and cloud services. Addressing some key challenges in the allocation of shared resources to user requests (jobs) in such settings, we consider the…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
We study the online preemptive scheduling of intervals and jobs (with restarts). Each interval or job has an arrival time, a deadline, a length and a weight. The objective is to maximize the total weight of completed intervals or jobs.…
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are…
We analyze the problem of job scheduling with preempting on weighted jobs that can have either linear or exponential penalties. We review relevant literature on the problem and create and describe a few online algorithms that perform…
We are given a set of jobs, each one specified by its release date, its deadline and its processing volume (work), and a single (or a set of) speed-scalable processor(s). We adopt the standard model in speed-scaling in which if a processor…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…
We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…