This paper addresses the scheduling problem of minimizing the total weighted tardiness on a single machine with step-deteriorating jobs. With the assumption of deterioration, the job processing times are modeled by step functions of job…
Real-life parallel machine scheduling problems can be characterized by: (i) limited information about the exact task duration at scheduling time, and (ii) an opportunity to reschedule the remaining tasks each time a task processing is…
Path planning for multiple unmanned aerial vehicles is a difficult task, and even more for a fleet of fixed-wing aircraft. One specific case is the transition to, or between, formation flight patterns, which requires synchronous arrivals…
This work presents a model for the Tramp Ship Scheduling problem including berth allocation considerations, motivated by a real case of a shipping company. The aim is to determine the travel schedule for each vessel considering multiple…
In this paper, scheduling problems of aircraft minimizing the total delays on a same runway and on dual runways are studied. In contrast to the algorithms based on mixed-integer optimization models in existing works, where the optimality…
Aircraft routing and crew pairing problems aims at building the sequences of flight legs operated respectively by airplanes and by crews of an airline. Given their impact on airlines operating costs, both have been extensively studied for…
In a co-design environment changes need to be integrated quickly and in an automated manner. This paper considers the challenge of creating and optimizing a global logistics system for the construction of a passenger aircraft within a…
In this paper we consider two problems regarding the scheduling of available personnel in order to perform a given quantity of work, which can be arbitrarily decomposed into a sequence of activities. We are interested in schedules which…
We address the multi-satellite scheduling problem with limited observation capacities that arises from the need to observe a set of targets on the Earth's surface using imaging resources installed on a set of satellites. We define and…
Disassembly is the first step of a variety of binary analysis and transformation techniques, such as reverse engineering, or binary rewriting. Recent disassembly approaches consist of three phases: an exploration phase, that…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time…
Airline operations are prone to delays and disruptions, since the schedules are generally tight and depend on a lot of resources. When disruptions occur, the flight schedule needs to be adjusted such that the operation can continue. Since…
This paper investigates the mission planning problem for spacecraft confronting orbital debris to achieve autonomous avoidance. Firstly, combined with the avoidance requirements, a closed-loop framework of autonomous avoidance for orbital…
Over the last decade, developments in unmanned aerial vehicles (UAVs) has greatly increased, and they are being used in many fields including surveillance, crisis management or automated mission planning. This last field implies the search…
Today, a competitive manufacturing environment imposes further production cost reduction on modern companies. Seeking proper recommendations in production and maintenance planning are the two essential cornerstones of effective production…
Any large functioning system consists of equipment that needs to be repaired during its lifetime. The methods of mathematical programming are used to formalize the optimization problem of preventive equipment repair planning in this paper.…
The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable…
This paper considers the integrated problem of quay crane assignment, quay crane scheduling, yard location assignment, and vehicle dispatching operations at a container terminal. The main objective is to minimize vessel turnover times and…
This paper deals with operational models for integrated shift and task scheduling problem. Staff scheduling problem is a special case of this with staff requirements as given input to the problem. Both problems become hard to solve when the…
The cyclic hoist scheduling problem originates in electroplating lines, where a single or multiple hoists transport parts between processing tanks subject to technological constraints. The objective is typically to determine a cyclic…