Related papers: Solving a large oral examination timetabling probl…
A new multi-objective method for the thesis defence scheduling problem is introduced. The problem involves appointing committees to defences and assigning them to a time slot and room. A multi-objective approach is necessary to provide a…
The Set-union Knapsack Problem (SUKP) is a generalization of the popular 0-1 knapsack problem. Given a set of weighted elements and a set of items with profits where each item is composed of a subset of elements, the SUKP involves packing a…
In scheduling and timetabling applications, the mutual-exclusion constraint stipulates that certain pairs of tasks that cannot be executed at the same time. This corresponds to the vertex colouring problem in graph theory, for which there…
This paper presents an efficient approach for the evaluation of multi-parametric mixed integer quadratic programming (mp-MIQP) solutions, occurring for instance in control problems involving discrete time hybrid systems with quadratic cost.…
With the growth of complexity and extent, large scale interconnected network systems, e.g. transportation networks or infrastructure networks, become more vulnerable towards external disruptions. Hence, managing potential disruptive events…
One of the most fundamental problems in Computer Science is the Knapsack problem. Given a set of n items with different weights and values, it asks to pick the most valuable subset whose total weight is below a capacity threshold T. Despite…
Multi Expression Programming (MEP) is a Genetic Programming variant that uses linear chromosomes for solution encoding. A unique feature of MEP is its ability of encoding multiple solutions of a problem in a single chromosome. In this paper…
The Job-shop Scheduling Problem (JSP) is a well-known and challenging combinatorial optimization problem in which tasks sharing a machine are to be arranged in a sequence such that encompassing jobs can be completed as early as possible. In…
In this paper, a new upper bound for the Multiple Knapsack Problem (MKP) is proposed, based on the idea of relaxing MKP to a {\em Bounded Sequential Multiple Knapsack Problem}, i.e., a multiple knapsack problem in which item sizes are…
This paper deals with a distributed Mixed-Integer Linear Programming (MILP) set-up arising in several control applications. Agents of a network aim to minimize the sum of local linear cost functions subject to both individual constraints…
This paper introduces an extension to the Orienteering Problem (OP), called Clustered Orienteering Problem with Subgroups (COPS). In this variant, nodes are arranged into subgroups, and the subgroups are organized into clusters. A reward is…
This paper addresses the problem of tightening the mixed-integer linear programming (MILP) formulation for continuous piecewise linear (CPWL) approximations of data sets in arbitrary dimensions. The MILP formulation leverages the…
We address a challenging tank blending and scheduling problem regarding operations for a chemical plant. We model the problem as a nonconvex MIQCP, then approximate this model as a MILP using a discretization-based approach. We combine a…
With the accelerated development of Industry 4.0, intelligent manufacturing systems increasingly require efficient task allocation and scheduling in multi-robot systems. However, existing methods rely on domain expertise and face challenges…
This paper focuses on the problem of supplying the workstations of assembly lines with components during the production process. For that specific problem, this paper presents a Mixed Integer Linear Program (MILP) that aims at minimizing…
A MILP model for an extended version of the Flexible Job Shop Scheduling problem is proposed. The extension allows the precedences between operations of a job to be given by an arbitrary directed acyclic graph rather than a linear order.…
We propose a new algorithm for solving multistage stochastic mixed integer linear programming (MILP) problems with complete continuous recourse. In a similar way to cutting plane methods, we construct nonlinear Lipschitz cuts to build lower…
We consider the problem of finding an n-agent joint-policy for the optimal finite-horizon control of a decentralized Pomdp (Dec-Pomdp). This is a problem of very high complexity (NEXP-hard in n >= 2). In this paper, we propose a new…
The Multi-mode Resource Availability Cost Problem (MRACP) optimizes resource availability to minimize usage costs and is a recent project scheduling problem variant. The Multi-Mode On-Site Workshop Availability Cost Problem (MOSWACP)…
Maintaining instantaneous balance between electricity supply and demand is critical for reliability and grid instability. System operators achieve this through solving the task of Unit Commitment (UC),ca high dimensional large-scale…