Related papers: Improved and Parameterized Algorithms for Online M…
In this paper, we consider the multi-level aggregation problem with deadlines (MLAPD) previously studied by Bienkowski et al. (2015), Buchbinder et al. (2017), and Azar and Touitou (2019). This is an online problem where the algorithm…
In the Multi-Level Aggregation Problem (MLAP), requests arrive at the nodes of an edge-weighted tree T, and have to be served eventually. A service is defined as a subtree X of T that contains its root. This subtree X serves all requests…
We consider a multi-level aggregation problem in a weighted rooted tree, studied recently by Bienkowski et al. (2015). In this problem requests arrive over time at the nodes of the tree, and each request specifies a deadline. A request is…
This paper presents a new research direction for online Multi-Level Aggregation (MLA) with delays. In this problem, we are given an edge-weighted rooted tree $T$, and we have to serve a sequence of requests arriving at its vertices in an…
In this paper, we present a framework used to construct and analyze algorithms for online optimization problems with deadlines or with delay over a metric space. Using this framework, we present algorithms for several different problems. We…
This paper studies a new online problem, referred to as \emph{min-cost perfect matching with delays (MPMD)}, defined over a finite metric space (i.e., a complete graph with positive edge weights obeying the triangle inequality)…
Managing delivery deadlines in automated warehouses and factories is crucial for maintaining customer satisfaction and ensuring seamless production. This study introduces the problem of online multi-agent pickup and delivery with task…
We introduce and study spatiotemporal online allocation with deadline constraints ($\mathsf{SOAD}$), a new online problem motivated by emerging challenges in sustainability and energy. In $\mathsf{SOAD}$, an online player completes a…
We consider the problem of online Min-cost Perfect Matching with Delays (MPMD) recently introduced by Emek et al, (STOC 2016). This problem is defined on an underlying $n$-point metric space. An adversary presents real-time requests online…
The Weighted Tree Augmentation Problem (WTAP) is a fundamental well-studied problem in the field of network design. Given an undirected tree $G=(V,E)$, an additional set of edges $L \subseteq V\times V$ disjoint from $E$ called…
This paper presents a new research direction for the Min-cost Perfect Matching with Delays (MPMD) - a problem introduced by Emek et al. (STOC'16). In the original version of this problem, we are given an $n$-point metric space, where…
The Weighted Tree Augmentation problem (WTAP) is a fundamental problem in network design. In this paper, we consider this problem in the online setting. We are given an $n$-vertex spanning tree $T$ and an additional set $L$ of edges (called…
The Matching Augmentation Problem (MAP) has recently received significant attention as an important step towards better approximation algorithms for finding cheap $2$-edge connected subgraphs. This has culminated in a…
We consider the problem of online Min-cost Perfect Matching with Delays (MPMD) introduced by Emek et al. (STOC 2016). In this problem, an even number of requests appear in a metric space at different times and the goal of an online…
The capacitated tree cover problem with edge loads is a variant of the tree cover problem, where we are given facility opening costs, edge costs and loads, as well as vertex loads. We try to find a tree cover of minimum cost such that the…
This work studies online scheduling algorithms for buffer management, develops new algorithms, and analyzes their performances. Packets arrive at a release time r, with a non-negative weight w and an integer deadline d. At each time step,…
In the Min-cost Perfect Matching with Delays (MPMD) problem, 2 m requests arrive over time at points of a metric space. An online algorithm has to connect these requests in pairs, but a decision to match may be postponed till a more…
We pursue a study of the Generalized Demand Matching problem, a common generalization of the $b$-Matching and Knapsack problems. Here, we are given a graph with vertex capacities, edge profits, and asymmetric demands on the edges. The goal…
The Joint Replenishment Problem (JRP) is a classical inventory management problem, that aims to model the trade-off between coordinating orders for multiple commodities (and their cost) with holding costs incurred by meeting demand in…
In an edge-cloud system, mobile devices can offload their computation intensive tasks to an edge or cloud server to guarantee the quality of service or satisfy task deadline requirements. However, it is challenging to determine where tasks…