In the aftermath of a hurricane, humanitarian logistics plays a critical role in delivering relief items to the affected areas in a timely fashion. This paper proposes a novel stochastic lookahead framework that implements a two-stage…
We consider a logistics planning problem of prepositioning relief items in preparation for an impending hurricane landfall. This problem is modeled as a multiperiod network flow problem where the objective is to minimize the logistics cost…
Climate change has led to an increase in the frequency and severity of extreme weather events, posing significant challenges for power distribution systems. In response, this work presents a planning approach in order to enhance the…
This paper investigates inland port infrastructure investment planning under uncertain commodity demand conditions. A two-stage stochastic optimization is developed to model the impact of demand uncertainty on infrastructure planning and…
The global increase in energy consumption and demand has forced many countries to transition into including more diverse energy sources in their electricity market. To efficiently utilize the available fuel resources, all energy sources…
Significant outages from weather and climate extremes have highlighted the critical need for resilience-centered risk management of the grid. This paper proposes a multi-stage stochastic robust optimization (SRO) model that advances the…
We consider a multiperiod stochastic capacitated facility location problem under uncertain demand and budget in each period. Using a scenario tree representation of the uncertainties, we formulate a multistage stochastic integer program to…
Decisions for a variable renewable resource generators commitment in the energy market are typically made in advance when little information is obtainable about wind availability and market prices. Much research has been published…
In this study, we consider two classes of multicriteria two-stage stochastic programs in finite probability spaces with multivariate risk constraints. The first-stage problem features a multivariate stochastic benchmarking constraint based…
The growing prevalence of extreme weather events driven by climate change poses significant challenges to power system resilience. Infrastructure damage and prolonged power outages highlight the urgent need for effective grid-hardening…
Location of depots and routing of emergency response units are assumed to be interdependent in the incident management system. System costs will be excessive if delay regarding routing decisions is ignored when locating response units. This…
We consider the problem of preparing for a disaster season by determining where to open warehouses and how much relief item inventory to preposition in each. Then, after each disaster, prepositioned items are distributed to demand nodes…
Energy storage promotes the integration of renewables by operating with charge and discharge policies that balance an intermittent power supply. A key challenge in this emerging sector is how to optimize the operation of storage assets…
We present a stochastic programming model for informing the deployment of ad hoc flood mitigation measures to protect electrical substations prior to an imminent and uncertain hurricane. The first stage captures the deployment of a fixed…
Tanker water systems play critical role in providing adequate service to meet potable water demands in the face of acute water crisis in many cities globally. Managing tanker movements among the supply and demand sides requires an efficient…
We study risk-aware linear policy approximations for the optimal operation of an energy system with stochastic wind power, storage, and limited fuel. The resulting problem is a sequential decision-making problem with rolling forecasts. In…
In this paper we analyze the effect of two modelling approaches for supply planning problems under uncertainty: two-stage stochastic programming (SP) and robust optimization (RO). The comparison between the two approaches is performed…
Production planning must account for uncertainty in a production system, arising from fluctuating demand forecasts. Therefore, this article focuses on the integration of updated customer demand into the rolling horizon planning cycle. We…
This paper addresses a central challenge of jointly considering shorter-term (e.g. hourly) and longer-term (e.g. yearly) uncertainties in power system planning with increasing penetration of renewable and storage resources. In conventional…
Flood risk is correlated in space and time, challenging insurance systems that rely on diversification across assets. Financial instruments governing flood coverage are typically structured as 1 to 5-year contracts, exposing portfolios to…