Related papers: Weighted Chairman Assignment and Flow-Time Schedul…
The starting point of this paper is the problem of scheduling $n$ jobs with processing times and due dates on a single machine so as to minimize the total processing time of tardy jobs, i.e., $1||\sum p_j U_j$. This problem was identified…
Let G be an edge-weighted hypergraph on n vertices, m edges of size \le s, where the edges have real weights in an interval [1,W]. We show that if we can approximate a maximum weight matching in G within factor alpha in time T(n,m,W) then…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
We give a 1.488-approximation for the classic scheduling problem of minimizing total weighted completion time on unrelated machines. This is a considerable improvement on the recent breakthrough of $(1.5 - 10^{-7})$-approximation (STOC…
We present an $\tilde{O}\left(m^{\frac{10}{7}}U^{\frac{1}{7}}\right)$-time algorithm for the maximum $s$-$t$ flow problem and the minimum $s$-$t$ cut problem in directed graphs with $m$ arcs and largest integer capacity $U$. This matches…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with…
This paper addresses resource allocation problem with a separable objective function under a single linear constraint, formulated as maximizing $\sum_{j=1}^{n}R_j(x_j)$ subject to $\sum_{j=1}^{n}x_j=k$ and $x_j\in\{0,\dots,m\}$. While…
We present and analyze a wait-free deterministic algorithm for solving the at-most-once problem: how m shared-memory fail-prone processes perform asynchronously n jobs at most once. Our algorithmic strategy provides for the first time…
We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many…
We study policies aiming to minimize the weighted sum of completion times of jobs in the context of coordination mechanisms for selfish scheduling problems. Our goal is to design local policies that achieve a good price of anarchy in the…
The Windows Scheduling Problem, also known as the Pinwheel Problem, is to schedule periodic jobs subject to their processing frequency demands. Instances are given as a set of jobs that have to be processed infinitely often such that the…
In the Time-Windows Unsplittable Flow on a Path problem (twUFP) we are given a resource whose available amount changes over a given time interval (modeled as the edge-capacities of a given path $G$) and a collection of tasks. Each task is…
We consider the problem of assigning tasks to agents under time conflicts, with applications also to frequency allocations in point-to-point wireless networks. In particular, we are given a set $V$ of $n$ agents, a set $E$ of $m$ tasks, and…
We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of…
We present an algorithm for computing $s$-$t$ maximum flows in directed graphs in $\widetilde{O}(m^{4/3+o(1)}U^{1/3})$ time. Our algorithm is inspired by potential reduction interior point methods for linear programming. Instead of using…
In this paper we provide an algorithm which given any $m$-edge $n$-vertex directed graph with integer capacities at most $U$ computes a maximum $s$-$t$ flow for any vertices $s$ and $t$ in $m^{11/8+o(1)}U^{1/4}$ time with high probability.…
We study the problem of scheduling $m$ tasks to $n$ selfish, unrelated machines in order to minimize the makespan, where the execution times are independent random variables, identical across machines. We show that the VCG mechanism, which…
In the classical interval scheduling type of problems, a set of $n$ jobs, characterized by their start and end time, need to be executed by a set of machines, under various constraints. In this paper we study a new variant in which the jobs…
This paper addresses the scheduling problem of coflows in identical parallel networks, which is a well-known $NP$-hard problem. Coflow is a relatively new network abstraction used to characterize communication patterns in data centers. We…