Job-Shop Scheduling Problem (JSSP) is a combinatorial optimization problem where tasks need to be scheduled on machines in order to minimize criteria such as makespan or delay. To address more realistic scenarios, we associate a probability…
Within the project management context, project scheduling serves as an indispensable component, functioning as a fundamental tool for planning, monitoring, controlling, and managing projects more broadly. Although the resource-constrained…
Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…
Scheduling problems in manufacturing, logistics and project management have frequently been modeled using the framework of Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max). Due to the…
Reinforcement learning (RL) is increasingly adopted in job shop scheduling problems (JSSP). But RL for JSSP is usually done using a vectorized representation of machine features as the state space. It has three major problems: (1) the…
This study presents a hybrid metaheuristic for the resource-constrained project scheduling problem (RCPSP), which integrates a genetic algorithm (GA) and a neighborhood search strategy (NS). The RCPSP consists of a set of activities that…
Resource-constrained project scheduling problems (RCPSP) are at the heart of many production planning problems across a plethora of applications. Although the problem has been studied since the early 1960s, most developments and test…
Resource Constrained Project Scheduling Problems (RCPSPs) without preemption are well-known NP-hard combinatorial optimization problems. A feasible RCPSP solution consists of a time-ordered schedule of jobs with corresponding execution…
We formulate the Resource-Constrained Project Scheduling Problem (RCPSP) as optimal search over the reachability graph of a Timed Transition Petri Net with Resources, using relative-delay tokens so that scheduling decisions correspond to…
In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests…
The Integrated Process Planning and Scheduling (IPPS) problem combines process route planning and shop scheduling to achieve high efficiency in manufacturing and maximize resource utilization, which is crucial for modern manufacturing…
We propose a framework to learn to schedule a job-shop problem (JSSP) using a graph neural network (GNN) and reinforcement learning (RL). We formulate the scheduling process of JSSP as a sequential decision-making problem with graph…
Solving job shop scheduling problems (JSSPs) with a fixed strategy, such as a priority dispatching rule, may yield satisfactory results for several problem instances but, nevertheless, insufficient results for others. From this…
We consider the classical problem of scheduling task graphs corresponding to complex applications on distributed computing systems. A number of heuristics have been previously proposed to optimize task scheduling with respect to metrics…
Effective resource utilization and decreased makespan in heterogeneous High Performance Computing (HPC) environments are key benefits of workload mapping and scheduling. Tools such as Snakemake, a workflow management solution, employ…
The problem of scheduling under resource constraints is widely applicable. One prominent example is power management, in which we have a limited continuous supply of power but must schedule a number of power-consuming tasks. Such problems…
This paper investigates concurrency-constrained scheduling problems, where the objective is to construct a schedule for a set of jobs subject to concurrency restrictions. Formally, we are given a conflict graph $G$ defined over a set of $n$…
Due to complex sets of interrelated activities in aircraft heavy maintenance (AHM), many airlines have to deal with substantial aircraft maintenance downtime. The scheduling problem in AHM is regarded as an NP-hard problem. Using exact…
Dataless neural networks represent a paradigm shift in applying neural architectures to combinatorial optimization problems, eliminating the need for training datasets by encoding problem instances directly into network parameters. Despite…
Job shop scheduling problems (JSSPs) represent a critical and challenging class of combinatorial optimization problems. Recent years have witnessed a rapid increase in the application of graph neural networks (GNNs) to solve JSSPs, albeit…