Related papers: Algorithms for dynamic scheduling in manufacturing…
This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max)). Recent advances in Constraint Programming (CP) and Temporal Networks have reinvoked…
We consider the problem of efficiently scheduling the production of goods for a model steel manufacturing company. We propose a new approach for solving this classic problem, using techniques from the statistical physics of complex networks…
The conventional design of real-time approaches depends heavily on the normal performance of systems and it often becomes incapacitated in dealing with catastrophic scenarios effectively. There are several investigations carried out to…
We consider a distributed computing network consisting of a master and multiple workers processing tasks of different types. The master is running multiple applications. Each application stochastically generates real-time jobs with a strict…
The primary motivation for uptake of virtualization has been resource isolation, capacity management and resource customization allowing resource providers to consolidate their resources in virtual machines. Various approaches have been…
Modern business models have enabled service systems to leverage a large pool of casual employees with flexible hours, paid based on piece rates, to fulfill on-demand work. These systems have been successfully implemented in sectors such as…
Scheduling in the factory setting is compounded by computational complexity and temporal uncertainty. Together, these two factors guarantee that the process of constructing an optimal schedule will be costly and the chances of executing…
Motivated by the increasing importance of providing delay-guaranteed services in general computing and communication systems, and the recent wide adoption of learning and prediction in network control, in this work, we consider a general…
To support reliable and low-latency communication, Time-Sensitive Networking introduced protocols and interfaces for resource allocation in Ethernet. However, the implementation of these allocation algorithms has not yet been covered by the…
Construction projects frequently experience schedule delays and forecasting uncertainty due to variability in labor productivity, material availability, weather conditions, and project coordination. Conventional deterministic scheduling…
Being fundamentally a non-equilibrium process, synchronization comes with unavoidable energy costs and has to be maintained under the constraint of limited resources. Such resource constraints are often reflected as a finite coupling budget…
We study online mechanisms for preemptive scheduling with deadlines, with the goal of maximizing the total value of completed jobs. This problem is fundamental to deadline-aware cloud scheduling, but there are strong lower bounds even for…
Virtualization technology has enabled applications to be decoupled from the underlying hardware providing the benefits of portability, better control over execution environment and isolation. It has been widely adopted in scientific grids…
Scheduling is a key decision-making process to improve the performance of flexible manufacturing systems. Place-timed Petri nets provide a formal method for graphically modeling and analyzing such systems. By generating reachability graphs…
In temporal planning, many different temporal network formalisms are used to model real world situations. Each of these formalisms has different features which affect how easy it is to determine whether the underlying network of temporal…
We consider the flow network model to solve the multiprocessor real-time task scheduling problems. Using the flow network model or its generic form, linear programming (LP) formulation, for the problems is not new. However, the previous…
Deciding the best future execution time is a critical task in many business activities while evolving time series forecasting, and optimal timing strategy provides such a solution, which is driven by observed data. This solution has plenty…
Many modern schedulers can dynamically adjust their service capacity to match the incoming workload. At the same time, however, unpredictability and instability in service capacity often incur operational and infrastructure costs. In this…
In this work, we consider a scheduling problem faced by production companies with large electricity consumption. Due to the contract with the electric utility, the production companies are obligated to comply with the total energy…
Emerging reconfigurable datacenters allow to dynamically adjust the network topology in a demand-aware manner. These datacenters rely on optical switches which can be reconfigured to provide direct connectivity between racks, in the form of…