Related papers: A Little Clairvoyance Is All You Need
We consider the problem of online preemptive scheduling on a single machine to minimize the total flow time. In clairvoyant scheduling, where job processing times are revealed upon arrival, the Shortest Remaining Processing Time (SRPT)…
We study the problem of preemptively scheduling jobs online over time on a single machine to minimize the total flow time. In the traditional clairvoyant scheduling model, the scheduler learns about the processing time of a job at its…
Consider a problem in which $n$ jobs that are classified into $k$ types arrive over time at their release times and are to be scheduled on a single machine so as to minimize the maximum flow time. The machine requires a setup taking $s$…
Scheduling questions arise naturally in many different areas among which operating system design, compiling,... In real life systems, the characteristics of the jobs (such as release time and processing time) are usually unknown and…
Shortest Remaining Processing Time (SRPT) is a well known preemptive scheduling algorithm for uniprocessor and multiprocessor systems. SRPT finds applications in the emerging areas such as scheduling of client's requests that are submitted…
We consider the online problem of scheduling jobs on identical machines, where jobs have precedence constraints. We are interested in the demanding setting where the jobs sizes are not known up-front, but are revealed only upon completion…
We consider energy-efficient scheduling on multiprocessors, where the speed of each processor can be individually scaled, and a processor consumes power $s^{\alpha}$ when running at speed $s$, for $\alpha>1$. A scheduling algorithm needs to…
We study a fundamental online scheduling problem where jobs with processing times, weights, and deadlines arrive online over time at their release dates. The task is to preemptively schedule these jobs on a single or multiple (possibly…
We consider the online resource minimization problem in which jobs with hard deadlines arrive online over time at their release dates. The task is to determine a feasible schedule on a minimum number of machines. We rigorously study this…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is…
It is well known that size-based scheduling policies, which take into account job size (i.e., the time it takes to run them), can perform very desirably in terms of both response time and fairness. Unfortunately, the requirement of knowing…
\textit{Weighted shortest processing time first} (WSPT) is one of the best known algorithms for total weighted completion time scheduling problems. For each job $J_j$, it first combines the two independent job parameters weight $w_j$ and…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
This paper considers using predictions in the context of the online Joint Replenishment Problem with Deadlines (JRP-D). Prior work includes asymptotically optimal competitive ratios of $O(1)$ for the clairvoyant setting and $O(\sqrt{n})$ of…
We consider the classical problem of scheduling $n$ jobs with release dates on both single and identical parallel machines. We measure the quality of service provided to each job by its stretch, which is defined as the ratio of its response…
We consider non-clairvoyant scheduling with online precedence constraints, where an algorithm is oblivious to any job dependencies and learns about a job only if all of its predecessors have been completed. Given strong impossibility…
The non-clairvoyant scheduling problem has gained new interest within learning-augmented algorithms, where the decision-maker is equipped with predictions without any quality guarantees. In practical settings, access to predictions may be…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
We introduce and study a general scheduling problem that we term the Packing Scheduling problem. In this problem, jobs can have different arrival times and sizes; a scheduler can process job $j$ at rate $x_j$, subject to arbitrary packing…
When parallelizing a set of jobs across many servers, one must balance a trade-off between granting priority to short jobs and maintaining the overall efficiency of the system. When the goal is to minimize the mean flow time of a set of…