Security-constrained unit commitment (SCUC) is solved for power system day-ahead generation scheduling, which is a large-scale mixed-integer linear programming problem and is very computationally intensive. Model reduction of SCUC may bring…
With increased reliance on cyber infrastructure, large scale power networks face new challenges owing to computational scalability. In this paper we focus on developing an asynchronous decentralized solution framework for the Unit…
The objective of electric power system operators is to determine cost-effective operating points by resolving optimization problems that include physical and engineering constraints. As empirical evidence and operator experience indicate,…
We consider the problem of minimizing costs in the generation unit commitment problem, a cornerstone in electric power system operations, while enforcing an N-k-e reliability criterion. This reliability criterion is a generalization of the…
The unit commitment problem (UC) is an optimization problem concerning the operation of electrical generators. Many algorithms have been proposed for the UC and in recent years a more decentralized approach, by solving the UC with…
In this paper, the Unit Commitment (UC) problem in a power network with low levels of rotational inertia is studied. Frequency-related constraints, namely the limitation on Rate-of-Change-of-Frequency (RoCoF), frequency nadir and…
Efficient methods for large-scale security constrained unit commitment (SCUC) problems have long been an important research topic and a challenge especially in market clearing computation. For large-scale SCUC, the Lagrangian relaxation…
Security-constrained unit commitment (SCUC) model is used for power system day-ahead scheduling. However, current SCUC model uses a static network to deliver power and meet demand optimally. A dynamic network can provide a lower optimal…
With the increasing penetration of renewable energy, frequency response and its security are of significant concerns for reliable power system operations. Frequency-constrained unit commitment (FCUC) is proposed to address this challenge.…
The deep penetration of wind and solar power is a critical component of the future power grid. However, the intermittency and stochasticity of these renewable resources bring significant challenges to the reliable and economic operation of…
In this paper we present a formulation of the unit commitment problem with AC power flow constraints. It is solved by a Benders decomposition in which the unit commitment master problem is formulated as a mixed-integer problem with…
This paper proposes a data-driven version of the Benders decomposition algorithm applied to the stochastic unit commitment (SUC) problem. The proposed methodology aims at finding a trade-off between the size of the Benders master problem…
Unit Commitment (UC) is a fundamental problem in power system operations. When coupled with generation maintenance, the joint optimization problem poses significant computational challenges due to coupling constraints linking maintenance…
In this article, we survey the main models, techniques, concepts, and results centered on the design and performance evaluation of engineered systems that rely on a utilization-dependent component (UDC) whose operation may depend on its…
In this paper, we study unit commitment (UC) problems considering the uncertainty of load and wind power generation. UC problem is formulated as a chance-constrained two-stage stochastic programming problem where the chance constraint is…
In the face of extreme events, e.g., hurricanes, the transmission systems, especially the transmission lines, are affected across time and space. To mitigate these impacts on the day-ahead market from a probabilistic perspective, a…
The problem of detecting and removing redundant constraints is fundamental in optimization. We focus on the case of linear programs (LPs) in dictionary form, given by $n$ equality constraints in $n+d$ variables, where the variables are…
Security-constrained unit commitment (SCUC) is a computationally complex process utilized in power system day-ahead scheduling and market clearing. SCUC is run daily and requires state-of-the-art algorithms to speed up the process. The…
The increasing penetration of renewable energy sources introduces significant uncertainty in power system operations, making traditional deterministic unit commitment approaches computationally expensive. This paper presents a machine…
The Security-Constrained Unit Commitment (SCUC) problem presents formidable computational challenges due to its combinatorial complexity, large-scale network dimensions, and numerous security constraints. While conventional temporal…