Related papers: BEPCII and CEPC
The construction of two electron linacs and an optical FEL system is proposed. This facility, which would serve primarily as a Higgs-boson collider factory, could be built in two stages, each with distinct physics objectives requiring…
Luminosity upgrades of the Fermilab Tevatron pbar-p collider have been shown to allow experimental detection of a Standard Model (SM) Higgs boson up to $m_{H_{SM}}\sim 120$ GeV via $WH_{SM} \to \ell\nu b\bar{b}$ events. This limit nearly…
It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with multi-gap resistive plate chamber (MRPC), aiming at overall time resolution about 80 ps. After the entire electronics system is ready,…
Results based on 106 M $\psi'$ events and about 226 M $J/\psi$ events acquired with the BESIII detector at BEPCII are reported, including a confirmation of the BESII $p\bar{p}$ threshold enhancement in $J/\psi \to \gamma p\bar{p}$,…
A major LHCb detector upgrade will be installed during long shutdown~4 (LS4) of the CERN Large Hadron Collider. The experiment will operate at a maximum luminosity of up to $1.5\times 10^{34}\mathrm{cm}^{-2}\mathrm{s}^{-1}$, with acceptance…
In the Circular Electron Positron Collider (CEPC), a measurement of the Higgs CP mixing through $e^{+} e^{-} \rightarrow Z H \rightarrow l^{+} l^{-}(e^{+} e^{-} /\mu^{+} \mu^{-}) H(\rightarrow b \bar{b} / c \bar{c} / g g)$ process is…
We summarize the outcome of the 10th meeting of the International Astronomical Consortium for High Energy Calibration (IACHEC), held in Beijing (People's Republic of China) in April 2015. Over 80 scientists directly involved in the…
We study the prospects of the B-L model with an additional $Z'$ boson to be a Higgs boson factory at high-energy and high-luminosity linear electron positron colliders, such as the ILC and CLIC, through the Higgs-strahlung process…
This White Paper has been prepared as a planning document for the Division of High Energy Physics of the U. S. Department of Energy. Recent progress in lattice-based studies of physics beyond the standard model is summarized, and major…
A search for the dimuon decay of the Standard Model Higgs boson is performed using the Monte Carlo simulated events to mimic data corresponding to an integrated luminosity of 5.6 ab$^{-1}$ collected with the Circular Electron-Positron…
CERN has recently launched the Future Circular Collider (FCC) study to deal with all aspects of an ambitious post-LHC possible programme. The emphasis of the study is on a 100 TeV proton collider to be housed in a 80-100 km new ring in the…
The second phase of the RHIC Beam Energy Scan (BES-II) was conducted between 2019 and 2021. High statistics data was collected by the STAR experiment for Au+Au collisions at $\sqrt{s_{NN}}$ from 7.7 to 27 GeV in collider mode and from 3 to…
Identifying the leptons inside jets is critical for the measurements of Higgs boson and the flavor physics program at the CEPC, a proposed Higgs/Z factory with the main ring circumference of 100 km. Using the CEPC baseline software, we…
We look at the prospects for detecting light bosons, $X$, at proposed Z factories assuming a production of $10^{12}$ Z bosons. Such a large yield is within the design goals of future FCC-ee and CEPC colliders. Specifically we look at the…
Chapter 6 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in…
Present data do not rule out the light neutral Higgs particle $h$ or $A$ with mass below 40--50 GeV in the framework of the general 2HDM ("Model II"). The recent limits from LEP I on the parameters of the model, based on the Bjorken process…
This document is the final report by the Committee on the Scientific Case of the ILC Operating at 250 GeV as a Higgs Factory. This committee was commissioned by the Japan Association of High Energy Physicists. The purpose of this committee…
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch…
The plan for the International Linear Collider is now being prepared as a staged design, with the first stage at 250 GeV and later stages achieving the full project specifications with 4 ab-1 at 500 GeV. This talk will present the…
The planed HERA upgrade will increase the integrated luminosity by two orders of magnitude.A new program of electron-nucleus collisions at HERA is under discussion now.In this connection we present prospects for the study of a light neutral…