Related papers: 3.415-Approximation for Coflow Scheduling via Iter…
Collaborative edge computing has become a popular paradigm where edge devices collaborate by sharing resources. Data dissemination is a fundamental problem in CEC to decide what data is transmitted from which device and how. Existing works…
As the gap between compute and I/O performance tends to grow, modern High-Performance Computing (HPC) architectures include a new resource type: an intermediate persistent fast memory layer, called burst buffers. This is just one of many…
Scheduling on dataflow graphs (also known as computation graphs) is an NP-hard problem. The traditional exact methods are limited by runtime complexity, while reinforcement learning (RL) and heuristic-based approaches struggle with…
We give an algorithm that, with high probability, maintains a $(1-\epsilon)$-approximate $s$-$t$ maximum flow in undirected, uncapacitated $n$-vertex graphs undergoing $m$ edge insertions in $\tilde{O}(m+ n F^*/\epsilon)$ total update time,…
We consider a network design problem called the generalized terminal backup problem. Whereas earlier work investigated the edge-connectivity constraints only, we consider both edge- and node-connectivity constraints for this problem. A…
The main objective of this paper is to improve the Round Robin scheduling algorithm using the dynamic time slice concept. CPU scheduling becomes very important in accomplishing the operating system (OS) design goals. The intention should be…
In the Edge-Disjoint Paths with Congestion problem (EDPwC), we are given an undirected n-vertex graph G, a collection M={(s_1,t_1),...,(s_k,t_k)} of demand pairs and an integer c. The goal is to connect the maximum possible number of the…
In a classical problem in scheduling, one has $n$ unit size jobs with a precedence order and the goal is to find a schedule of those jobs on $m$ identical machines as to minimize the makespan. It is one of the remaining four open problems…
Assigning jobs onto identical machines with the objective to minimize the maximal load is one of the most basic problems in combinatorial optimization. Motivated by product planing and data placement, we study a natural extension called…
There is a strong interest in finding challenging instances of NP-hard problems, from the perspective of showing quantum advantage. Due to the limits of near-term NISQ devices, it is moreover useful if these instances are small. In this…
We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by…
Our work presents a new iterative scheme to approximate the fixed points of nonexpansive mapping. The proposed algorithm is constructed to enhance convergence efficiency while preserving theoretical robustness. Under appropriate assumptions…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
New optical technologies offer the ability to reconfigure network topologies dynamically, rather than setting them once and for all. This is true in both optical wide area networks (optical WANs) and in datacenters, despite the many…
The virtualization and softwarization of modern computer networks introduces interesting new opportunities for a more flexible placement of network functions and middleboxes (firewalls, proxies, traffic optimizers, virtual switches, etc.).…
Routing and scheduling problems are fundamental problems in combinatorial optimization, and also have many applications. Most variations of these problems are NP-Hard, so we need to use heuristics to solve these problems on large instances,…
Given a complete graph $G = (V, E)$ where each edge is labeled $+$ or $-$, the Correlation Clustering problem asks to partition $V$ into clusters to minimize the number of $+$edges between different clusters plus the number of $-$edges…
Following [21, 23], the present work investigates a new relative entropy-regularized algorithm for solving the optimal transport on a graph problem within the randomized shortest paths formalism. More precisely, a unit flow is injected into…
In 1976, Coffman and Sethi conjectured that a natural extension of LPT list scheduling to the bicriteria scheduling problem of minimizing makespan over flowtime optimal schedules, called LD algorithm, has a simple worst-case performance…
The multiway-cut problem is, given a weighted graph and k >= 2 terminal nodes, to find a minimum-weight set of edges whose removal separates all the terminals. The problem is NP-hard, and even NP-hard to approximate within 1+delta for some…