We study the shared processor scheduling problem with a single shared processor where a unit time saving (weight) obtained by processing a job on the shared processor depends on the job. A polynomial-time optimization algorithm has been…
We study classic scheduling problems on uniformly related machines. Efficient polynomial time approximation schemes (EPTAS's) are fast and practical approximation schemes. New methods and techniques are essential in developing such improved…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical…
The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
In this paper we study the classical single machine scheduling problem where the objective is to minimize the total weight of tardy jobs. Our analysis focuses on the case where one or more of three natural parameters is either constant or…
We investigate deterministic non-preemptive online scheduling with delayed commitment for total completion time minimization on parallel identical machines. In this problem, jobs arrive one-by-one and their processing times are revealed…
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of…
We study the computational complexity of scheduling jobs on a single speed-scalable processor with the objective of capturing the trade-off between the (weighted) flow time and the energy consumption. This trade-off has been extensively…
We consider the problem of finding patrol schedules for $k$ robots to visit a given set of $n$ sites in a metric space. Each robot has the same maximum speed and the goal is to minimize the weighted maximum latency of any site, where the…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…
This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
We study the fundamental scheduling problem $1\mid r_j\mid\sum w_j U_j$: schedule a set of $n$ jobs with weights, processing times, release dates, and due dates on a single machine, such that each job starts after its release date and we…
An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…
We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while…