Related papers: Local Sherman's Algorithm for Multi-commodity Flow
We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical…
We propose a new (theoretical) computational model for the study of massive data processing with limited computational resources. Our model measures the complexity of reading the very large data sets in terms of the data size N and analyzes…
In this paper we present an $\tilde{O}(m\sqrt{n}\log^{O(1)}U)$ time algorithm for solving the maximum flow problem on directed graphs with $m$ edges, $n$ vertices, and capacity ratio $U$. This improves upon the previous fastest running time…
We study Euclidean $k$-Means under the Massively Parallel Computation (MPC) model, focusing on the \emph{fully-scalable} setting. Our main result is a fully-scalable $O((\log n/\log\log n)^2)$-approximation in $O(1)$ rounds. Previously,…
We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…
In this paper we provide new randomized algorithms with improved runtimes for solving linear programs with two-sided constraints. In the special case of the minimum cost flow problem on $n$-vertex $m$-edge graphs with integer…
We introduce a new approach to the maximum flow problem in undirected, capacitated graphs using $\alpha$-\emph{congestion-approximators}: easy-to-compute functions that approximate the congestion required to route single-commodity demands…
In the geometric transportation problem, we are given a collection of points $P$ in $d$-dimensional Euclidean space, and each point is given a supply of $\mu(p)$ units of mass, where $\mu(p)$ could be a positive or a negative integer, and…
In this paper, we study the weighted $k$-server problem on the uniform metric in both the offline and online settings. We start with the offline setting. In contrast to the (unweighted) $k$-server problem which has a polynomial-time…
We design new parallel algorithms for clustering in high-dimensional Euclidean spaces. These algorithms run in the Massively Parallel Computation (MPC) model, and are fully scalable, meaning that the local memory in each machine may be…
We give the first almost-linear total time algorithm for deciding if a flow of cost at most $F$ still exists in a directed graph, with edge costs and capacities, undergoing decremental updates, i.e., edge deletions, capacity decreases, and…
The All-Pairs Min-Cut problem (aka All-Pairs Max-Flow) asks to compute a minimum $s$-$t$ cut (or just its value) for all pairs of vertices $s,t$. We study this problem in directed graphs with unit edge/vertex capacities (corresponding to…
In measurement-based quantum computing (MBQC), computation is carried out by a sequence of measurements and corrections on an entangled state. Flow, and related concepts, are powerful techniques for characterising the dependence of the…
The area of computing with uncertainty considers problems where some information about the input elements is uncertain, but can be obtained using queries. For example, instead of the weight of an element, we may be given an interval that is…
We present the first near optimal approximation schemes for the maximum weighted (uncapacitated or capacitated) $b$--matching problems for non-bipartite graphs that run in time (near) linear in the number of edges. For any…
A well-studied nonlinear extension of the minimum-cost flow problem is to minimize the objective $\sum_{ij\in E} C_{ij}(f_{ij})$ over feasible flows $f$, where on every arc $ij$ of the network, $C_{ij}$ is a convex function. We give a…
In 2013, Orlin proved that the max flow problem could be solved in $O(nm)$ time. His algorithm ran in $O(nm + m^{1.94})$ time, which was the fastest for graphs with fewer than $n^{1.06}$ arcs. If the graph was not sufficiently sparse, the…
We introduce a simple and efficient numerical method to compute mean curvature flow with obstacles. The method augments the Merrimam-Bence-Osher scheme with a pointwise update that enforces the constraint and therefore retains the…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
In this paper, we develop an $O((m \log k) {\rm MSF} (n,m,1))$-time algorithm to find a half-integral node-capacitated multiflow of the maximum total flow-value in a network with $n$ nodes, $m$ edges, and $k$ terminals, where ${\rm MSF}…