English
Related papers

Related papers: Flow Shop Scheduling with Inter-Stage Flexibility …

200 papers

We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints…

Data Structures and Algorithms · Computer Science 2017-05-25 René van Bevern , Rolf Niedermeier , Ondřej Suchý

We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…

Data Structures and Algorithms · Computer Science 2018-12-03 Lin Chen , Nicole Megow , Roman Rischke , Leen Stougie , José Verschae

We consider the problem of efficiently scheduling the production of goods for a model steel manufacturing company. We propose a new approach for solving this classic problem, using techniques from the statistical physics of complex networks…

Physics and Society · Physics 2012-06-14 Osamu Yamaguchi , Soumen Roy , Raissa M. D'Souza

This paper first presents a parallel solution for the Flowshop Scheduling Problem in parallel environment, and then proposes a novel load balancing strategy. The proposed Proportional Fairness Strategy (PFS) takes computational performance…

Networking and Internet Architecture · Computer Science 2008-09-22 Zheng Sun , Xiaohong Huang , Yan Ma

We study the scheduling of flows on a switch with the goal of optimizing metrics related to the response time of the flows. The input to the problem is a sequence of flow requests on a switch, where the switch is represented by a bipartite…

Data Structures and Algorithms · Computer Science 2020-05-28 Hamidreza Jahanjou , Rajmohan Rajaraman , David Stalfa

We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…

Data Structures and Algorithms · Computer Science 2015-03-20 Leah Epstein , Asaf Levin

We study the fundamental problem of scheduling bidirectional traffic along a path composed of multiple segments. The main feature of the problem is that jobs traveling in the same direction can be scheduled in quick succession on a segment,…

Data Structures and Algorithms · Computer Science 2015-04-28 Yann Disser , Max Klimm , Elisabeth Lübbecke

Computing workflows in heterogeneous multiprocessor systems are frequently modeled as directed acyclic graphs of tasks and data blocks, which represent computational modules and their dependencies in the form of data produced by a task and…

Distributed, Parallel, and Cluster Computing · Computer Science 2022-06-14 Junwen Ding , Liangcai Song , Siyuan Li , Chen Wu , Ronghua He , Zhouxing Su , Zhipeng Lü

This paper presents a medium-term self-scheduling optimization of pumped hydro storage power plants with detailed consideration of short-term flexibility. A decomposition of the problem into inter- and intrastage subproblems, where the…

Optimization and Control · Mathematics 2014-03-20 Hubert Abgottspon , Göran Andersson

Production logistics has an important role as a chain that connects the components of the production system. The most important goal of production logistics plans is to keep the flow of the production system well. However, compared to the…

Optimization and Control · Mathematics 2022-04-01 Yongkuk Jeong , Gianpiero Canessa , Erik Flores-García , Tarun Kumar Agrawal , Magnus Wiktorsson

Speed-robust scheduling is the following two-stage problem of scheduling $n$ jobs on $m$ uniformly related machines. In the first stage, the algorithm receives the value of $m$ and the processing times of $n$ jobs; it has to partition the…

Data Structures and Algorithms · Computer Science 2024-07-17 Josef Minařík , Jiří Sgall

In this paper we study the partitioning approach for multiprocessor real-time scheduling. This approach seems to be the easiest since, once the partitioning of the task set has been done, the problem reduces to well understood uniprocessor…

Operating Systems · Computer Science 2011-02-03 Irina Lupu , Pierre Courbin , Laurent George , Joël Goossens

This paper approaches the integrated lot sizing and scheduling problem (ILSSP), in which non-identical machines work in parallel with non-triangular sequence-dependent setup costs and times, setup carry-over and capacity limitation. The aim…

Distributed, Parallel, and Cluster Computing · Computer Science 2021-01-14 Desiree M. Carvalho , Mariá C. V. Nascimento

In this work, we study the single machine scheduling problem with uncertain release times and processing times of jobs. We adopt a robust scheduling approach, in which the measure of robustness to be minimized for a given sequence of jobs…

Optimization and Control · Mathematics 2014-11-27 Nitish Umang , Alan L. Erera , Michel Bierlaire

This paper considers a recoverable robust single-machine scheduling problem under polyhedral uncertainty with the objective of minimising the total flow time. In this setting, a decision-maker must determine a first-stage schedule subject…

Optimization and Control · Mathematics 2022-03-08 Matthew Bold , Marc Goerigk

Most classical scheduling formulations assume a fixed and known duration for each activity. In this paper, we weaken this assumption, requiring instead that each duration can be represented by an independent random variable with a known…

Artificial Intelligence · Computer Science 2011-10-13 J. C. Beck , N. Wilson

We investigate algorithmic control of a large swarm of mobile particles (such as robots, sensors, or building material) that move in a 2D workspace using a global input signal (such as gravity or a magnetic field). We show that a maze of…

Emerging Technologies · Computer Science 2017-12-05 Aaron T. Becker , Erik D. Demaine , Sándor P. Fekete , Jarrett Lonsforda , Rose Morris-Wright

We consider a problem that marries network flows and scheduling, motivated by the need to schedule maintenance activities in infrastructure networks, such as rail or general logistics networks. Network elements must undergo regular…

Optimization and Control · Mathematics 2015-06-23 Natashia Boland , Thomas Kalinowski , Simranjit Kaur

We study a difficult problem of how to schedule complex workflows with precedence constraints under a limited budget in the cloud environment. We first formulate the scheduling problem as an integer programming problem, which can be…

Distributed, Parallel, and Cluster Computing · Computer Science 2019-03-05 Hang Zhang , Xiaoying Zheng , Ye Xia , Mingqi Li

In this paper we consider the problem of mixed-criticality (MC) scheduling of implicit-deadline sporadic task systems on a homogenous multiprocessor platform. Focusing on dual-criticality systems, algorithms based on the fluid scheduling…

Operating Systems · Computer Science 2020-03-12 Saravanan Ramanathan , Arvind Easwaran , Hyeonjoong Cho