Related papers: Simple approximation algorithms for Polyamorous Sc…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
Makespan minimization in restricted assignment $(R|p_{ij}\in \{p_j, \infty\}|C_{\max})$ is a classical problem in the field of machine scheduling. In a landmark paper in 1990 [8], Lenstra, Shmoys, and Tardos gave a 2-approximation algorithm…
In the stable marriage and roommates problems, a set of agents is given, each of them having a strictly ordered preference list over some or all of the other agents. A matching is a set of disjoint pairs of mutually accepted agents. If any…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
We give polynomial time logarithmic approximation guarantees for the budget minimization, as well as for the profit maximization versions of minimum spanning tree interdiction. In this problem, the goal is to remove some edges of an…
It is required to find an optimal order of constructing the edges of a network so as to minimize the sum of the weighted connection times of relevant pairs of vertices. Construction can be performed anytime anywhere in the network, with a…
We settle the pseudo-polynomial complexity of the Demand Strip Packing (DSP) problem: Given a strip of fixed width and a set of items with widths and heights, the items must be placed inside the strip with the objective of minimizing the…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
Path cover is a well-known intractable problem that finds a minimum number of vertex disjoint paths in a given graph to cover all the vertices. We show that a variant, where the objective function is not the number of paths but the number…
In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…
We study the discrete Bamboo Garden Trimming problem (BGT), where we are given n bamboos with different growth rates. At the end of each day, one can cut down one bamboo to height zero. The goal in BGT is to make a perpetual schedule of…
In this paper, we consider the problem of scheduling an application on a parallel computational platform. The application is a particular task graph, either a linear chain of tasks, or a set of independent tasks. The platform is made of…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
Modern platforms are using accelerators in conjunction with standard processing units in order to reduce the running time of specific operations, such as matrix operations, and improve their performance. Scheduling on such hybrid platforms…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
We consider the following general scheduling problem: The input consists of n jobs, each with an arbitrary release time, size, and a monotone function specifying the cost incurred when the job is completed at a particular time. The…
Since the publication of the first scheduling paper in 1954, a huge number of works dealing with different types of single machine problems appeared. They addressed many heuristics and enumerative procedures, complexity results or…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…