Related papers: Single-Machine Scheduling to Minimize the Number o…
The $1|B,r_j|\sum w_jU_j$ scheduling problem takes as input a batch setup time $\Delta$ and a set of $n$ jobs, each having a processing time, a release date, a weight, and a due date; the task is to find a sequence of batches that minimizes…
In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release…
We consider the $1||\sum w_J U_j$ problem, the problem of minimizing the weighted number of tardy jobs on a single machine. This problem is one of the most basic and fundamental problems in scheduling theory, with several different…
In this study, we investigate a robust single-machine scheduling problem under processing time uncertainty. The uncertainty is modeled using the budgeted approach, where each job has a nominal and deviation processing time, and the number…
We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints…
The $1 \mid \mid \Sigma w_j U_j$ problem asks to determine -- given $n$ jobs each with its own processing time, weight, and due date -- the minimum weighted number of tardy jobs in any single machine non-preemptive schedule for these jobs.…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
This paper studies the growing domain of Robotic Process Automation (RPA) problems. Motivated by scheduling problems arising in RPA, we study the parameterized complexity of the single-machine problem $1|\text{prec},r_j,d_j|*$. We focus on…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly…
In this paper we study the classical single machine scheduling problem where the objective is to minimize the total weight of tardy jobs. Our analysis focuses on the case where one or more of three natural parameters is either constant or…
Scheduling problems are fundamental in combinatorial optimization. Much work has been done on approximation algorithms for NP-hard cases, but relatively little is known about exact solutions when some part of the input is a fixed parameter.…
In this paper, we consider the parameterized complexity of the following scheduling problem. We must schedule a number of jobs on $m$ machines, where each job has unit length, and the graph of precedence constraints consists of a set of…
This paper is concerned with the $1||\sum p_jU_j$ problem, the problem of minimizing the total processing time of tardy jobs on a single machine. This is not only a fundamental scheduling problem, but also a very important problem from a…
In this work, we study the single machine scheduling problem with uncertain release times and processing times of jobs. We adopt a robust scheduling approach, in which the measure of robustness to be minimized for a given sequence of jobs…
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
The starting point of this paper is the problem of scheduling $n$ jobs with processing times and due dates on a single machine so as to minimize the total processing time of tardy jobs, i.e., $1||\sum p_j U_j$. This problem was identified…
We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…