High Performance Computing (HPC) systems are used across a wide range of disciplines for both large and complex computations. HPC systems often receive many thousands of computational tasks at a time, colloquially referred to as jobs. These…
This paper considers multiprocessor task scheduling in a multistage hybrid flow-shop environment. The problem even in its simplest form is NP-hard in the strong sense. The great deal of interest for this problem, besides its theoretical…
Scheduling plays an important role in automated production. Its impact can be found in various fields such as the manufacturing industry, the service industry and the technology industry. A scheduling problem (NP-hard) is a task of finding…
Online algorithms are usually analyzed using the notion of competitive ratio which compares the solution obtained by the algorithm to that obtained by an online adversary for the worst possible input sequence. Often this measure turns out…
We give a $(2 + \epsilon)$-approximation algorithm for minimizing total weighted completion time on a single machine under release time and precedence constraints. This settles a recent conjecture made in [18]
Job scheduling is a well-known Combinatorial Optimization problem with endless applications. Well planned schedules bring many benefits in the context of automated systems: among others, they limit production costs and waste. Nevertheless,…
Flow routing over inter-datacenter networks is a well-known problem where the network assigns a path to a newly arriving flow potentially according to the network conditions and the properties of the new flow. An essential system-wide…
Scheduling jobs with given processing times on identical parallel machines so as to minimize their total completion time is one of the most basic scheduling problems. We study interesting generalizations of this classical problem involving…
Consider a problem in which $n$ jobs that are classified into $k$ types arrive over time at their release times and are to be scheduled on a single machine so as to minimize the maximum flow time. The machine requires a setup taking $s$…
Rescheduling problems arise in a variety of situations where a previously planned schedule needs to be adjusted to deal with unforeseen events. A common problem is the arrival of new orders, i.e. jobs, which have to be integrated into the…
We consider a single-server queue with renewal arrivals and i.i.d. service times, in which the server employs either the preemptive Shortest Remaining Processing Time (SRPT) policy, or its non-preemptive variant, Shortest Job First (SJF).…
We investigate the recoverable robust single machine scheduling problem under interval uncertainty. In this setting, jobs have first-stage processing times p and second-stage processing times q and we aim to find a first-stage and…
We investigate machine learning approaches for optimizing real-time staffing decisions in semi-automated warehouse sortation systems. Operational decision-making can be supported at different levels of abstraction, with different…
The focus of this paper is to increase our understanding of the Longest Processing Time First (LPT) heuristic. LPT is a classical heuristic for the fundamental problem of uniform machine scheduling. For different machine speeds, LPT was…
Path cover is a well-known intractable problem that finds a minimum number of vertex disjoint paths in a given graph to cover all the vertices. We show that a variant, where the objective function is not the number of paths but the number…
Job-shop scheduling problem (JSP) is a mathematical optimization problem widely used in industries like manufacturing, and flexible JSP (FJSP) is also a common variant. Since they are NP-hard, it is intractable to find the optimal solution…
This paper addresses the scheduling problem of minimizing the total weighted tardiness on a single machine with step-deteriorating jobs. With the assumption of deterioration, the job processing times are modeled by step functions of job…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
We study nearly-linear time approximation algorithms for non-preemptive scheduling problems in two settings: the unrelated machine setting, and the identical machine with job precedence constraints setting, under the well-studied objectives…
In inland waterways, the efficient management of water lock operations impacts the level of congestion and the resulting uncertainty in inland waterway transportation. To achieve reliable and efficient traffic, schedules should be easy to…