Related papers: Preparing Fermilab to Carry Out the P5 Plan
Data from High Energy Physics (HEP) experiments are collected with significant financial and human effort and are mostly unique. An inter-experimental study group on HEP data preservation and long-term analysis was convened as a panel of…
Reliable, high-intensity operation of the Fermilab Accelerator Complex is critical to the success of the Long-Baseline Neutrino Facility and Deep Underground Neutrino Experiment. We describe the requirements and infrastructure necessary to…
We describe the status of the Main Injector particle production Experiment (MIPP) at Fermilab which has to date acquired 18 million events of particle interactions using (5 GeV/c-120 GeV/c) $\pi^\pm, K^\pm$ and $p^\pm$ beams on various…
The HEP faculty hire job market has stayed fairly plateaued over the years not keeping up with number of postdocs and PhD produced seeking such employment. Physicists who seek jobs outside this realm face challenges. For example those hired…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy for the implementation of this leading-edge,…
The Data Handling Pipeline ("Pipeline") has been developed for the Fermi Gamma-Ray Space Telescope (Fermi) Large Area Telescope (LAT) which launched in June 2008. Since then it has been in use to completely automate the production of data…
The objective of this Project Definition Report (PDR) is to document a possible solution for the conventional facilities required to house the nuSTORM experiment on the Fermilab site. It is recognized that this effort is done in support of…
A report to the Fermilab Director from the Study Group on Future Neutrino Experiments at Fermilab
The US Physics community completed the Snowmass planning process in 2022, culminating in the HEPAP Particle Physics Project Prioritization Panel (P5) publishing its summary report at the end of 2023. Building on this, the US Magnet…
Future colliders are an essential component of a strategic vision for particle physics. Conceptual studies and technical developments for several exciting future collider options are underway internationally. In order to realize a future…
In contemporary workplaces, meetings are essential for exchanging ideas and ensuring team alignment but often face challenges such as time consumption, scheduling conflicts, and inefficient participation. Recent advancements in Large…
The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…
The Intensity Frontier (IF) experiments at Fermilab require computing, software, data handling, and infrastructure development for detector and beamline design and to extract maximum scientific output from the data. The emphasis of…
This document is the final report of the Community Planning Process (CPP) that describes a comprehensive plan to deliver fusion energy and to advance plasma science. The CPP was initiated by the executive committee of the American Physical…
The D0 detector at Fermilab is in the final stages of an extensive upgrade. It is designed to meet the demands imposed by high luminosity Tevatron running planned to begin March 2001. The design and performance of the detector subsystems…
The 2020 update of the European Strategy for Particle Physics emphasised the importance of an intensified and well-coordinated programme of accelerator R&D, supporting the design and delivery of future particle accelerators in a timely,…
The growing demand for sustainable cryogenic operations at Fermilab has underscored the need to improve helium management, particularly at the Industrial Building 3A (IB3A) test facility. IB3A characterizes and tests superconductors,…
The D0 Detector at Fermilab is currently undergoing an extensive upgrade to participate in the Run II data taking which shall begin on March 1, 2001. The design of the detector meets the requirements of the high luminosity environment…
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…