Related papers: Approximating Unrelated Machine Weighted Completio…
In Constrained Correlation Clustering, the goal is to cluster a complete signed graph in a way that minimizes the number of negative edges inside clusters plus the number of positive edges between clusters, while respecting hard constraints…
Weighted timed automata have been defined in the early 2000's for modelling resource-consumption or -allocation problems in real-time systems. Optimal reachability is decidable in weighted timed automata, and a symbolic forward algorithm…
We consider the online unrelated-machine load balancing problem with recourse, where the algorithm is allowed to re-assign prior jobs. We give a $(2+\epsilon)$-competitive algorithm for the problem with $O_\epsilon(\log n)$ amortized…
An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…
The reciprocal function, 1/x, is important for many real-time algorithms. It is used in a large variety of algorithms from areas ranging from iterative estimation to machine learning. Many of these algorithms are iterative in nature and…
We investigate the scheduling of $n$ jobs divided into $c$ classes on $m$ identical parallel machines. For every class there is a setup time which is required whenever a machine switches from the processing of one class to another class.…
Given two matroids $\mathcal{M}_1$ and $\mathcal{M}_2$ over the same ground set, the matroid intersection problem is to find the maximum cardinality common independent set. In the weighted version of the problem, the goal is to find a…
In [C.W. Gear, T.J. Kaper, I.G. Kevrekidis, and A. Zagaris, Projecting to a Slow Manifold: Singularly Perturbed Systems and Legacy Codes, SIAM J. Appl. Dyn. Syst. 4 (2005) 711-732], we developed a class of iterative algorithms within the…
We study the classic problem of minimizing the expected total completion time of jobs on $m$ identical machines in the setting where the sizes of the jobs are stochastic. Specifically, the size of each job is a random variable whose…
We introduce a new iterative rounding technique to round a point in a matroid polytope subject to further matroid constraints. This technique returns an independent set in one matroid with limited violations of the other ones. On top of the…
We study problems of scheduling jobs on related machines so as to minimize the makespan in the setting where machines are strategic agents. In this problem, each job $j$ has a length $l_{j}$ and each machine $i$ has a private speed $t_{i}$.…
There is a long history of approximation schemes for the problem of scheduling jobs on identical machines to minimize the makespan. Such a scheme grants a $(1+\epsilon)$-approximation solution for every $\epsilon > 0$, but the running time…
We study the approximability of an existing framework for clustering edge-colored hypergraphs, which is closely related to chromatic correlation clustering and is motivated by machine learning and data mining applications where the goal is…
In this paper, we present a new iterative rounding framework for many clustering problems. Using this, we obtain an $(\alpha_1 + \epsilon \leq 7.081 + \epsilon)$-approximation algorithm for $k$-median with outliers, greatly improving upon…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…
We consider the online problem of minimizing weighted flow-time on unrelated machines. Although much is known about this problem in the resource-augmentation setting, these results assume that jobs can be preempted. We give the first…
We study bicriteria versions of Makespan Minimization on Unrelated Machines and Santa Claus by allowing a constrained number of rejections. Given an instance of Makespan Minimization on Unrelated Machines where the optimal makespan for…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…