There is a growing need for new optimization methods to facilitate the reliable and cost-effective operation of power systems with intermittent renewable energy resources. In this paper, we formulate the robust AC optimal power flow…
A robust power scheduling algorithm is proposed to schedule power flow between the main electricity grid and a microgird with solar energy generation and battery energy storage subject to uncertainty in solar energy production. To avoid…
Due to the established energy production methods contribution to the climate crisis, renewable energy is to replace a substantial part of coal or nuclear plants to prevent greenhouse gases or toxic waste entering the atmosphere. This…
As renewable wind energy penetration rates continue to increase, one of the major challenges facing grid operators is the question of how to control transmission grids in a reliable and a cost-efficient manner. The stochastic nature of wind…
Compute-and-forward (CF) is a relaying strategy which allows the relay to decode a linear combination of the transmitted messages. This work studies the optimal power allocation problem for the CF scheme in fast fading channels for…
Evolving power systems with increasing levels of stochasticity call for a need to solve optimal power flow problems with large quantities of random variables. Weather forecasts, electricity prices, and shifting load patterns introduce…
As renewable wind energy penetration rates continue to increase, one of the major challenges facing grid operators is the question of how to control transmission grids in a reliable and a cost-efficient manner. The stochastic nature of wind…
The N-1-1 contingency criterion considers the con- secutive loss of two components in a power system, with intervening time for system adjustments. In this paper, we consider the problem of optimizing generation unit commitment (UC) while…
Unit commitment (UC) is one of the most important power system operation problems. To integrate higher penetration of wind power into power systems, more compressed air energy storage (CAES) plants are being built. Existing cavern models…
One of the most complicating factors in decentralized optimization for power systems is the modeling of power flow equations. Existing formulations for DC power flows either have limited scalability or are very dense and unstructured,…
Linear approximations of the AC power flow equations are of great significance for the computational efficiency of large-scale optimal power flow (OPF) problems. Put differently, the feasibility of the obtained solution is essential for…
Hydro unit commitment is the problem of maximizing water use efficiency while minimizing start-up costs in the daily operation of multiple hydro plants, subject to constraints on short-term reservoir operation, and long-term goals. A…
This paper proposes a component-based dual decomposition of the nonconvex AC optimal power flow (OPF) problem, where the modified dual function is solved in a distributed fashion. The main contribution of this work is that is demonstrates…
The widespread uncertainties have made the interaction between wind power and power grid more complicated and difficult to model and handle. This paper proposes an approach for the solution of unit commitment (UC) problem incorporating…
The increase of renewables in the grid and the volatility of the load create uncertainties in the day-ahead prices of electricity markets. Adaptive robust optimization (ARO) and stochastic optimization have been used to make commitment and…
We present a decomposition approach for obtaining good feasible solutions for the security-constrained alternating-current optimal power flow (SCACOPF) problem at an industrial scale and under real-world time and computational limits. The…
Optimizing maintenance scheduling is a major issue to improve the performance of hydropower plants. We study a system of several physical components of the same family: either a set of turbines, a set of transformers or a set of generators.…
In this paper we introduce a continuous time multi stage stochastic optimization for scheduling generating units, their commitment, reserve capacities and their continuous time generation profiles in the day-ahead wholesale electricity…
The rapid growth of data centers increasingly requires data center operators to "bring own generation" to complement the available utility power plants to supply all or part of data center load. This practice sharply increases the number of…
Wind integration in power grids is very difficult, essentially because of the uncertain nature of wind speed. Forecasting errors on output from wind turbines may have costly consequences. For instance, power might be bought at highest price…