This paper deals with operational models for integrated shift and task scheduling problem. Staff scheduling problem is a special case of this with staff requirements as given input to the problem. Both problems become hard to solve when the…

Optimization and Control · Mathematics 2022-08-17 G S R Murthy , T R Lalita

A MILP model for an extended version of the Flexible Job Shop Scheduling problem is proposed. The extension allows the precedences between operations of a job to be given by an arbitrary directed acyclic graph rather than a linear order.…

Data Structures and Algorithms · Computer Science 2014-01-16 Ernesto G. Birgin , Paulo Feofiloff , Cristina G. Fernandes , Everton L. de Melo , Marcio T. I. Oshiro , Débora P. Ronconi

The surgical department and adequate access to health care are critical problems. The operating room plays a fundamental role in the performance of a hospital. The real problem faces several issues to collect data and optimize scheduling…

Signal Processing · Electrical Eng. & Systems 2019-12-25 Zahra Namazian , Emad Roghanian

This paper considers the scheduling of job families on parallel machines with time constraints on machine qualifications. In this problem, each job belongs to a family and a family can only be executed on a subset of qualified machines. In…

Distributed, Parallel, and Cluster Computing · Computer Science 2019-10-17 Arnaud Malapert , Margaux Nattaf

This paper addresses the challenge of planning a sequence of tasks to be performed by multiple robots while minimizing the overall completion time subject to timing and precedence constraints. Our approach uses the Timed Partial Orders…

Oil products are the main source of energy in the world today. Distribution of these products is one of the main issues in the industry. The main tools for this work are pipelines, and along with it, railways, shipping and roads are also…

Optimization and Control · Mathematics 2023-01-03 Seyyed Hamed Moghimi , Jafar Habibi , Hamid Jahad , Mohammad Amin Fazli

In the era of Industry 4.0, the focus is on the minimization of human element and maximizing the automation in almost all the industrial and manufacturing establishments. These establishments contain numerous processing systems, which can…

Artificial Intelligence · Computer Science 2020-05-01 Prashant K Gupta , Pranab K. Muhuri

This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…

Data Structures and Algorithms · Computer Science 2019-04-23 Benjamin Moseley

This paper extends our previous work in [1],[2], on optimal scheduling of autonomous vehicle arrivals at intersections, from one to a grid of intersections. A scalable distributed Mixed Integer Linear Program (MILP) is devised that solves…

Systems and Control · Electrical Eng. & Systems 2020-07-15 Faraz Ashtiani , S. Alireza Fayazi , Ardalan Vahidi

This paper proposes a framework for scheduling the observation and download tasks of multiple agile satellites with practical considerations such as attitude transition time, onboard data capacity, and stereoscopic image acquisition. A…

Systems and Control · Electrical Eng. & Systems 2019-12-03 Junhong Kim , Doo-Hyun Cho , Jaemyung Ahn , Han-Lim Choi

This paper addresses the incompatible case of parallel batch scheduling, where compatible jobs belong to the same family, and jobs from different families cannot be processed together in the same batch. The state-of-the-art constraint…

Systems and Control · Electrical Eng. & Systems 2025-09-09 Jorge A. Huertas , Pascal Van Hentenryck

This paper presents a multiagent approach as a paradigm for scheduling parallel jobs in a parallel system. Scheduling parallel jobs is performed as a means to balance the load of a system in order to improve the performance of a parallel…

Distributed, Parallel, and Cluster Computing · Computer Science 2015-06-29 Jaderick P. Pabico

Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…

Artificial Intelligence · Computer Science 2020-10-26 Viktoria A. Hauder , Andreas Beham , Sebastian Raggl , Sophie N. Parragh , Michael Affenzeller

Optimizing schedules in real-world settings often requires considering workload constraints, specially for human resources, to ensure regulatory compliance, impose rest periods, or level the workload over the working horizon. This paper…

Optimization and Control · Mathematics 2026-05-21 Tanguy Terrien , Cyrille Briand

This research investigates a multi-product capacitated lot-sizing and scheduling problem incorporating a novel learning effect, namely the period-based learning effect. This is inspired by a real case in a core analysis laboratory under a…

Optimization and Control · Mathematics 2025-01-10 Mohammad Rohaninejad , Behdin Vahedi-Nouri , Reza Tavakkoli-Moghaddam , Zdeněk Hanzálek

This paper approaches the integrated lot sizing and scheduling problem (ILSSP), in which non-identical machines work in parallel with non-triangular sequence-dependent setup costs and times, setup carry-over and capacity limitation. The aim…

Distributed, Parallel, and Cluster Computing · Computer Science 2021-01-14 Desiree M. Carvalho , Mariá C. V. Nascimento

This study introduces a mixed-integer linear programming (MILP) model, effectively co-optimizing patrolling, damage assessment, fault isolation, repair, and load re-energization processes. The model is designed to solve a vital operational…

Systems and Control · Electrical Eng. & Systems 2024-01-12 Ali Jalilian , Babak Taheri , Daniel K. Molzahn

This paper presents a scenario based robust optimization framework for short term energy scheduling in electricity intensive industrial plants, explicitly addressing uncertainty in planning decisions. The model is formulated as a two-stage…

Systems and Control · Electrical Eng. & Systems 2025-12-02 Sebastián Rojas-Innocenti , Enrique Baeyens , Alejandro Martín-Crespo , Sergio Saludes-Rodil , Fernando Frechoso Escudero

We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…

Optimization and Control · Mathematics 2021-07-22 Alexander Kononov , Yulia Kovalenko

In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. In this setting, jobs are required to be executed non-preemptively and in unison,…

Data Structures and Algorithms · Computer Science 2020-04-08 Dimitris Fotakis , Jannik Matuschke , Orestis Papadigenopoulos