Related papers: Minimizing Tardy Processing Time on a Single Machi…
We present a sublinear time algorithm for computing a near optimal low-rank approximation to any positive semidefinite (PSD) Toeplitz matrix $T\in \mathbb{R}^{d\times d}$, given noisy access to its entries. In particular, given entrywise…
In this paper, an exact algorithm in polynomial time is developed to solve unrestricted binary quadratic programs. The computational complexity is $O\left( n^{\frac{15}{2}}\right) $, although very conservative, it is sufficient to prove…
We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while…
We consider a variant of the NP-hard problem of assigning jobs to machines to minimize the completion time of the last job. Usually, precedence constraints are given by a partial order on the set of jobs, and each job requires all its…
This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
In this work, we study the classic submodular maximization problem under knapsack constraints and beyond. We first present an $(7/16-\varepsilon)$-approximate algorithm for single knapsack constraint, which requires…
We show how to compute a relative-error low-rank approximation to any positive semidefinite (PSD) matrix in sublinear time, i.e., for any $n \times n$ PSD matrix $A$, in $\tilde O(n \cdot poly(k/\epsilon))$ time we output a rank-$k$ matrix…
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
In this paper, we obtain a number of new simple pseudo-polynomial time algorithms on the well-known knapsack problem, focusing on the running time dependency on the number of items $n$, the maximum item weight $w_\mathrm{max}$, and the…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
Two seemingly unrelated problems, scheduling a multiclass queueing system and minimizing a submodular function, share a rather deep connection via the polymatroid that is characterized by a submodular set function on the one hand and…
We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…
This paper explores fast, polynomial time heuristic approximate solutions to the NP-hard problem of scheduling jobs on N identical machines. The jobs are independent and are allowed to be stopped and restarted on another machine at a later…
In the classical interval scheduling type of problems, a set of $n$ jobs, characterized by their start and end time, need to be executed by a set of machines, under various constraints. In this paper we study a new variant in which the jobs…
We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…
We consider optimal route planning when the objective function is a general nonlinear and non-monotonic function. Such an objective models user behavior more accurately, for example, when a user is risk-averse, or the utility function needs…
Given a multiset $X=\{x_1,..., x_n\}$ of real numbers, the {\it floating-point set summation} problem asks for $S_n=x_1+...+x_n$. Let $E^*_n$ denote the minimum worst-case error over all possible orderings of evaluating $S_n$. We prove that…
We propose an $\widetilde{O}(n + 1/\eps)$-time FPTAS (Fully Polynomial-Time Approximation Scheme) for the classical Partition problem. This is the best possible (up to a polylogarithmic factor) assuming SETH (Strong Exponential Time…