Related papers: Scheduling jobs that change over time
We consider the single machine scheduling problem with job-dependent machine deterioration. In the problem, we are given a single machine with an initial non-negative maintenance level, and a set of jobs each with a non-preemptive…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
Consider the problem where $n$ jobs, each with a release time, a deadline and a required processing time are to be feasibly scheduled in a single- or multi-processor setting so as to minimize the total energy consumption of the schedule. A…
We consider Johnson's rule for minimizing the makespan in the two-machine flow shop problem. Although its worst-case time complexity is O(n log n), we show that it is possible to detect in linear time whether a full sorting of jobs can be…
We are given a set of jobs, each one specified by its release date, its deadline and its processing volume (work), and a single (or a set of) speed-scalable processor(s). We adopt the standard model in speed-scaling in which if a processor…
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. In this setting, jobs are required to be executed non-preemptively and in unison,…
This paper mainly focuses on a resource leveling variant of a two-processor scheduling problem. The latter problem is to schedule a set of dependent UET jobs on two identical processors with minimum makespan. It is known to be…
In this work we study the problem of scheduling tasks with dependencies in multiprocessor architectures where processors have different speeds. We present the preemptive algorithm "Save-Energy" that given a schedule of tasks it post…
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be…
We consider online preemptive scheduling of jobs arriving one by one, to be assigned to two identical machines, with the goal of makespan minimization. We study the effect of selecting the best solution out of two independent solutions…
Scheduling with testing is a recent online problem within the framework of explorable uncertainty motivated by environments where some preliminary action can influence the duration of a task. Jobs have an unknown processing time that can be…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…