Related papers: A Subexponential Time Algorithm for Makespan Sched…
Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization…
The interval scheduling problem is one variant of the scheduling problem. In this paper, we propose a novel variant of the interval scheduling problem, whose definition is as follows: given jobs are specified by their {\em release times},…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
This paper presents improved approximation algorithms for the problem of multiprocessor scheduling under uncertainty, or SUU, in which the execution of each job may fail probabilistically. This problem is motivated by the increasing use of…
This paper studies the online scheduling problem of minimizing total flow time for $n$ jobs on $m$ identical machines. A classical $\Omega(n)$ lower bound shows that no deterministic single-machine algorithm can beat the trivial greedy,…
In the Online Machine Covering problem jobs, defined by their sizes, arrive one by one and have to be assigned to $m$ parallel and identical machines, with the goal of maximizing the load of the least-loaded machine. In this work, we study…
In the Proper Interval Completion problem we are given a graph G and an integer k, and the task is to turn G using at most k edge additions into a proper interval graph, i.e., a graph admitting an intersection model of equal-length…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
We study the Multiple Cluster Scheduling problem and the Multiple Strip Packing problem. For both problems, there is no algorithm with approximation ratio better than $2$ unless $P = NP$. In this paper, we present an algorithm with…
We study a natural variant of scheduling that we call \emph{partial scheduling}: In this variant an instance of a scheduling problem along with an integer $k$ is given and one seeks an optimal schedule where not all, but only $k$ jobs, have…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…
In the classical interval scheduling type of problems, a set of $n$ jobs, characterized by their start and end time, need to be executed by a set of machines, under various constraints. In this paper we study a new variant in which the jobs…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
We study the problem of scheduling $n$ independent moldable tasks on $m$ processors that arises in large-scale parallel computations. When tasks are monotonic, the best known result is a $(\frac{3}{2}+\epsilon)$-approximation algorithm for…
Given $n$ jobs with processing times $p_1,\dotsc,p_n\in\mathbb N$ and $m\le n$ machines with speeds $s_1,\dotsc,s_m\in\mathbb N$ our goal is to allocate the jobs to machines minimizing the makespan. We present an algorithm that solves the…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…