Related papers: Improved Approximation Algorithms for Minimizing t…
We give a 1.488-approximation for the classic scheduling problem of minimizing total weighted completion time on unrelated machines. This is a considerable improvement on the recent breakthrough of $(1.5 - 10^{-7})$-approximation (STOC…
The average coflow completion time (CCT) is the standard performance metric in coflow scheduling. However, standard CCT minimization may introduce unfairness between the data transfer phase of different computing jobs. Thus, while progress…
We present the first near optimal approximation schemes for the maximum weighted (uncapacitated or capacitated) $b$--matching problems for non-bipartite graphs that run in time (near) linear in the number of edges. For any…
In this paper, we present long-awaited algorithmic advances toward the efficient construction of near-optimal replenishment policies for a true inventory management classic, the economic warehouse lot scheduling problem. While this paradigm…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
We study the Multiple Cluster Scheduling problem and the Multiple Strip Packing problem. For both problems, there is no algorithm with approximation ratio better than $2$ unless $P = NP$. In this paper, we present an algorithm with…
Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with…
Datacenter networks routinely support the data transfers of distributed computing frameworks in the form of coflows, i.e., sets of concurrent flows related to a common task. The vast majority of the literature has focused on the problem of…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $m \geq 2$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its…
We introduce a new approach to the maximum flow problem in undirected, capacitated graphs using $\alpha$-\emph{congestion-approximators}: easy-to-compute functions that approximate the congestion required to route single-commodity demands…
We develop a novel algorithm to construct a congestion-approximator with polylogarithmic quality on a capacitated, undirected graph in nearly-linear time. Our approach is the first *bottom-up* hierarchical construction, in contrast to…
We provide a randomized linear time approximation scheme for a generic problem about clustering of binary vectors subject to additional constrains. The new constrained clustering problem encompasses a number of problems and by solving it,…
The input to the Multiway Cut problem is a weighted undirected graph, with nonnegative edge weights, and $k$ designated terminals. The goal is to partition the vertices of the graph into $k$ parts, each containing exactly one of the…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
Coffman and Sethi proposed a heuristic algorithm, called LD, for multi-processor scheduling, to minimize makespan over flowtime-optimal schedules. LD algorithm is a natural extension of a very well-known list scheduling algorithm, Longest…
In distributed computing frameworks like MapReduce, Spark, and Dyrad, a coflow is a set of flows transferring data between two stages of a job. The job cannot start its next stage unless all flows in the coflow finish. To improve the…