Related papers: PIII Project Overview and Status
The phase averaging reference line system provides the RF phase reference, LO and clock signals to the LLRF and other accelerator sub-systems. The PIP-II linac has RF systems at three frequencies - 162.5 MHz, 325 MHz and 650 MHz. A…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is under construction and due to begin operations in late 2004. NuMI will deliver an intense $\nu_{\mu}$ beam of variable energy 2-20 GeV directed into the Earth at 58 mrad.…
Fermilab will continue to maintain its pre-eminent position in the world of High Energy Physics, with a unique opportunity to make unprecedented studies of the top quark and major discoveries, until the Large Hadron collider (LHC) at CERN…
There are many stages in the LLRF and RF system development process for any new accelerator that can take advantage of hardware emulation of the high-power RF system and RF cavities. LLRF development, bench testing, control system…
This document is the second in a series of reports on the exciting physics that would be accessible at Fermilab in the event of an upgraded proton source. Where the first report covered a broad range of topics, this report focuses…
The accelerator for the APT Project is a 100 mA CW proton linac with an output energy of 1030 MeV. A High Energy Beam Transport (HEBT) conveys the beam to a raster expander, that provides a large rectangular distribution at a target/blanket…
Fermilab has had a very active long baseline neutrino program since initiation of the NuMI project in 1998. Commissioned in 2005, the NuMI beam with 400 kW design power has been in operation for the MINOS neutrino oscillation program since…
The Belle II detector at the SuperKEKB accelerator complex is covering a wide range of exciting physics topics. To achieve the project's research goals, a substantial increase of the data sample to 50~ab$^{-1}$ is needed, and for that, the…
For Project X Fermilab Main Injector will be required to provide up to 2.3 MW to a neutrino production target at energies between 60 and 120 GeV. To accomplish the above power levels 3 times the current beam intensity will need to be…
The design and production studies of the proton beamline of SPP, which aims to acquire know-how on proton accelerator technology thru development of man power and serves as particle accelerator technologies test bench, continue at…
The Fermilab proton source is capable of providing 8 GeV protons for both the future long-baseline neutrino program (NuMI), and for a new program of low energy muon experiments. In particular, if the 8 GeV protons are rebunched and then…
The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy for the implementation of this leading-edge,…
At the end of its operations in 2011, the Fermilab antiproton production complex consisted of a sophisticated target system, three 8-GeV storage rings (namely the Debuncher, the Accumulator and the Recycler), 25 independent multi-GHz…
High-beta superconducting radiofrequency (SRF) elliptical cavities are being developed for several accelerator projects including Project X, the European XFEL, and the International Linear Collider (ILC). Fermilab has recently established…
CEA is committed to the design, construction and commissioning of a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3 MeV to 35 MeV or…
The Mu2e experiment measures the conversion rate of muons into electrons and the Muon g-2 experiment measures the muon magnetic moment. Both experiments require 53 MHz batches of 8 GeV protons to be re-bunched into 150 ns, 2.5 MHz pulses…
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to…
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast…
China Spallation Neutron Source(CSNS) target power will upgrade to 500 kW(CSNS-II) from 300kW, energy gain of H-Linac will up to 300 MeV from 80 MeV using about 50 superconductor cavities. LLRF is an important device for controlling the…
As part of the PIP-II Injector Experiment (PXIE) accelerator, a four-vane radio frequency quadrupole (RFQ) accelerates a 30-keV, 1-mA to 10-mA H- ion beam to 2.1 MeV. It is designed to operate at a frequency of 162.5 MHz with arbitrary duty…