We have commissioned the digital Low Level RF (LLRF) system for storage ring RF at Advanced Light Source at Lawrence Berkeley National Lab (LBNL). The system is composed of 42 synchronous sampling channels for feedback control, diagnostics,…
A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a…
The KEK Accelerator Test Facility (ATF) is a dedicated testbed for nanobeam technologies in support of the International Linear Collider (ILC). Stable pulsed operation requires synchronization of the facility timing system with the…
Currently ALS is undergoing an upgrade to ALSU to produce 100 times brighter soft X-ray light. The LLRF system for Accumulator Ring (AR) is composed of two identical LLRF stations, for driving RF amplifiers. The closed loop RF amplitude and…
The first version of digital low level RF (DLLRF) for the Diamond Light Source storage ring and booster was developed with ALBA Synchrotron. Six systems have been built so far. Two of them are in routine operation controlling two normal…
The low level rf (LLRF) control system for the rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) started its operation in 2007. The key functions of the LLRF control system are the dual harmonic auto…
First beam commissioning of SuperKEKB (Phase-1), which is an asymmetry double ring collider of 7-GeV electron and 4-GeV positron beams, which had started from February, has been successfully accomplished at the end of June 2016, and the…
The proposed Next Linear Collider (NLC) contains linac systems operating at L,S,C, and X band. This paper describes a wideband modular low-level RF (LLRF) system applicable for all NLC pulsed RF systems. High speed digital IF techniques are…
KEK-ATF is studying low emittance, multi-bunch electron beam for the future linear collider. The energy instability of the 1.5 GeV linac has been a problem making the beam injection to the damping ring unstable. Because the unstable beam…
A 20 GHz LLRF system is being built using a two-board(RF Front End + ADC/DAC/FPGA) architecture. The RF Front End provides 8 down-converting channels and 3 up-converting channels (5.5-20 GHz RF to 0.05-3 GHz IF). Separate, phase locked,…
The SLAC mega-electron-volt (MeV) ultrafast electron diffraction (UED) instrument is a powerful "electron camera" for the study of time-resolved, ultrafast atomic & molecular dynamics in chemical and solid-state systems. The UED laser…
SuperKEKB is the e-/e+ collider which targets the world highest luminosity. In recent operation, SuperKEKB achieved a new world record of $4.71\times 10^{34} cm^{-2}s^{-1}$ for luminosity with the beam current of 1.4 A. In the future, the…
The construction of the 60-MeV proton linac has started as a low-energy front of the KEK/JAERI Joint Project for a high-intensity proton accelerator facility at KEK. The accelerating frequency is 324 MHz. Five UHF klystrons are used as an…
SPARC_LAB is a high-brightness electron photoinjector dedicated to FEL radiation production and research on novel acceleration techniques. It has been in operation at LNF since 2005. It is composed of a newly designed brazeless 1.6-cell…
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch…
A low level radio frequency (LLRF) control system is designed and constructed at Peking University, which is for the DC-SRF photo injector operating at 2K. Besides with continuous wave (CW), the system is also reliable with pulsed RF and…
The ISIS synchrotron at the Rutherford Appleton Laboratory in the UK now routinely uses a dual harmonic RF system to accelerate beam currents in excess of 230uA to run two target stations simultaneously. The acceleration in the ISIS…
A new laser-wire is being installed in the extraction line of the ATF at KEK. This device aims at demonstrating that laser-wires can be used to measure micrometre scale beam size.
A significant upgrade of the LHCb detector is scheduled to be installed in 2018-2019. Afterwards all sub-detectors will be read out at the LHC bunch crossing frequency of 40 MHz and the trigger will be fully implemented in software. The…
At the end of the Large Hadron Collider's Run 2, CERN's Proton Injector Linac 2, commissioned in 1978, delivered its final beam in December 2018. For Run 3, from March 2021, a new H$^{-}$ will take over the role: Linac4. The machine has…