In this work, we study a single-machine scheduling problem that aims at minimizing the total cost of a schedule subject to start-time dependent costs. This framework naturally captures scenarios where costs fluctuate throughout the day,…

Optimization and Control · Mathematics 2026-04-17 Sofía Rodríguez-Ballesteros , Javier Alcaraz , Laura Anton-Sanchez , Marc Goerigk , Dorothee Henke

We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time;…

Data Structures and Algorithms · Computer Science 2017-02-01 Fidaa Abed , Lin Chen , Yann Disser , Martin Groß , Nicole Megow , Julie Meißner , Alexander T. Richter , Roman Rischke

Fare planning is one among several steps in public transport planning. Fares are relevant for the covering of costs of the public transport operator, but also affect the ridership and the passenger satisfaction. A fare structure is the…

Optimization and Control · Mathematics 2025-02-13 Anita Schöbel , Reena Urban

Robust optimization is concerned with constructing solutions that remain feasible also when a limited number of resources is removed from the solution. Most studies of robust combinatorial optimization to date made the assumption that every…

Optimization and Control · Mathematics 2015-04-21 David Adjiashvili

Train timetable rescheduling (TTR) aims to promptly restore the original operation of trains after unexpected disturbances or disruptions. Currently, this work is still done manually by train dispatchers, which is challenging to maintain…

Machine Learning · Computer Science 2024-01-17 Peng Yue , Yaochu Jin , Xuewu Dai , Zhenhua Feng , Dongliang Cui

The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to…

Artificial Intelligence · Computer Science 2025-11-18 Guillaume Infantes , Stéphanie Roussel , Antoine Jacquet , Emmanuel Benazera

In this paper we present an algorithmic framework for solving a class of combinatorial optimization problems on graphs with bounded pathwidth. The problems are NP-hard in general, but solvable in linear time on this type of graphs. The…

Data Structures and Algorithms · Computer Science 2012-12-18 Mugurel Ionut Andreica

The problem of scheduling under resource constraints is widely applicable. One prominent example is power management, in which we have a limited continuous supply of power but must schedule a number of power-consuming tasks. Such problems…

Artificial Intelligence · Computer Science 2016-02-11 Szymon Sidor , Peng Yu , Cheng Fang , Brian Williams

Many infrastructure managers have the goal to increase the capacity of their railway infrastructure due to an increasing demand. While methods for performance calculations of railway line infrastructure are already well established, the…

Systems and Control · Electrical Eng. & Systems 2025-10-14 Tamme Emunds , Nils Nießen

Rail is a cost-effective and relatively low-emission mode for transporting intermodal containers over long distances. This paper addresses tactical planning of intermodal railroad operations by introducing a new problem that simultaneously…

Optimization and Control · Mathematics 2025-11-11 Julie Kienzle , Serge Bisaillon , Teodor Gabriel Crainic , Emma Frejinger

Our focus is on projects, i.e., business processes, which are emerging as the economic drivers of our times. Differently from day-to-day operational processes that do not require detailed planning, a project requires planning and…

Artificial Intelligence · Computer Science 2024-04-09 Izack Cohen

This document is the third sub-report from the research project SATT (Samplanering av trafikp{\aa}verkande {\aa}tg\"arder och trafikfl\"oden, modellstudie / Coordinated planning of temporary capacity restrictions and traffic flows, model…

Optimization and Control · Mathematics 2021-11-29 Tomas Lidén , Martin Aronsson

This study addresses the challenge of efficiently assigning locomotives in large freight rail networks, where operational complexity and power imbalances make cost-effective planning difficult. It presents a strategic optimization framework…

Optimization and Control · Mathematics 2025-07-31 Yunji Kim , Amira Hijazi , Kevin Dalmeijer , Pascal Van Hentenryck

The possible unavailability of urban rail-based transport services due to planned maintenance activities may have significant consequences on the perceived quality of service, thus affecting railway attractiveness. To cope with the…

Systems and Control · Electrical Eng. & Systems 2021-09-07 A lice Consilvio , Lorenzo Calabrò , Angela Di Febbraro , Nicola Sacco

In this paper we present a Mixed Integer Nonlinear Programming model that we developed as part of a pilot study requested by the R&D company Metrolab in order to design tools for finding solutions for line planning and timetable situations…

Optimization and Control · Mathematics 2021-01-12 Víctor Blanco , Eduardo Conde , Yolanda Hinojosa , Justo Puerto

Advanced integration of logistics systems has been promoted for the sake of competitiveness and sustainability. Such efforts will enable more globally optimal and flexible operations by efficiently utilizing transportation capacity. At the…

Physics and Society · Physics 2022-03-29 Takahiro Ezaki , Naoto Imura , Katsuhiro Nishinari

We consider the problem of assigning appearing times to the edges of a digraph in order to maximize the (average) temporal reachability between pairs of nodes. Motivated by the application to public transit networks, where edges cannot be…

Discrete Mathematics · Computer Science 2025-01-22 Filippo Brunelli , Pierluigi Crescenzi , Laurent Viennot

Periodic timetabling for public transportation networks is typically modelled as a Periodic Event Scheduling Problem (PESP). Solving instances of the benchmark library PESPlib to optimality continues to pose a challenge. As a further…

Optimization and Control · Mathematics 2025-10-15 Stephanie Riedmüller , Niels Lindner

In train networks, carefully-chosen delays may be beneficial for certain passengers, who would otherwise miss some connection. Given a simple (directed or undirected) temporal graph and a set of passengers (each specifying a starting…

Data Structures and Algorithms · Computer Science 2025-04-11 David C. Kutner , Anouk Sommer

This paper addresses the issues concerning the rescheduling of a static timetable in case of a disaster encountered in a large and complex railway network system. The proposed approach tries to modify the schedule so as to minimise the…

Multiagent Systems · Computer Science 2016-07-13 Poulami Dalapati , Piyush Agarwal , Animesh Dutta , Swapan Bhattacharya