Related papers: WSRPT is 1.2259-competitive for Weighted Completio…
Modern data centers serve workloads which are capable of exploiting parallelism. When a job parallelizes across multiple servers it will complete more quickly, but jobs receive diminishing returns from being allocated additional servers.…
We consider the online problem of minimizing weighted flow-time on unrelated machines. Although much is known about this problem in the resource-augmentation setting, these results assume that jobs can be preempted. We give the first…
This paper addresses the scheduling problem in mobile social networks. We begin by proving that the approximation ratio analysis presented in the paper by Zhang \textit{et al.} (IEEE Transactions on Mobile Computing, 2025) is incorrect, and…
We present three deterministic parameterized algorithms for well-studied packing and matching problems, namely, Weighted q-Dimensional p-Matching ((q,p)-WDM) and Weighted q-Set p-Packing ((q,p)-WSP). More specifically, we present an…
When parallelizing a set of jobs across many servers, one must balance a trade-off between granting priority to short jobs and maintaining the overall efficiency of the system. When the goal is to minimize the mean flow time of a set of…
Online models that allow recourse are highly effective in situations where classical models are too pessimistic. One such problem is the online machine covering problem on identical machines. In this setting, jobs arrive one by one and must…
This paper addresses the scheduling problem for unrelated crowd workers in mobile social networks, where the required service time for each task varies among the assigned crowd workers. The goal is to minimize the total weighted completion…
We consider scheduling on identical and unrelated parallel machines with job assignment restrictions. These problems are NP-hard and they do not admit polynomial time approximation algorithms with approximation ratios smaller than $1.5$…
The approximation ratio of the longest processing time (LPT) scheduling algorithm has been studied in several papers. While the tight approximation ratio is known for the case when all processors are identical, the ratio is not yet known…
We consider the following single-machine scheduling problem, which is often denoted $1||\sum f_{j}$: we are given $n$ jobs to be scheduled on a single machine, where each job $j$ has an integral processing time $p_j$, and there is a…
We consider TSP with time windows and service time. In this problem we receive a sequence of requests for a service at nodes in a metric space and a time window for each request. The goal of the online algorithm is to maximize the number of…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
An optimal solution to the problem of scheduling real-time tasks on a set of identical processors is derived. The described approach is based on solving an equivalent uniprocessor real-time scheduling problem. Although there are other…
We consider an online preemptive scheduling problem where jobs with deadlines arrive sporadically. A commitment requirement is imposed such that the scheduler has to either accept or decline a job immediately upon arrival. The scheduler's…
We introduce the following elementary scheduling problem. We are given a collection of n jobs, where each job has an integer length as well as a set Ti of time intervals in which it can be feasibly scheduled. Given a parameter B, the…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
The Workflow Satisfiability Problem (WSP) asks whether there exists an assignment of authorized users to the steps in a workflow specification, subject to certain constraints on the assignment. The problem is NP-hard even when restricted to…
We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
Job-shop scheduling problem (JSP) is a mathematical optimization problem widely used in industries like manufacturing, and flexible JSP (FJSP) is also a common variant. Since they are NP-hard, it is intractable to find the optimal solution…