Quality control lead times are one of most significant causes of loss of time in the pharmaceutical and cosmetics industries. This is partly due to the organization of laboratories that feature parallel multipurpose machines for…
This paper addresses the scheduling problem of minimizing the total weighted tardiness on a single machine with step-deteriorating jobs. With the assumption of deterioration, the job processing times are modeled by step functions of job…
In this paper, we study the problem of counting the number of different knapsack solutions with a prescribed cardinality. We present an FPTAS for this problem, based on dynamic programming. We also introduce two different types of semi-fair…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
With multiple identical unit speed servers, the online problem of scheduling jobs that migrate between two phases, limitedly parallelizable or completely sequential, and choosing their respective speeds to minimize the total flow time is…
This paper establishes performance guarantees for online algorithms that schedule stochastic, nonpreemptive jobs on unrelated machines to minimize the expected total weighted completion time. Prior work on unrelated machine scheduling with…
This paper considers an opportunistic scheduling problem over a renewal system. A controller observes a random event at the beginning of each renewal frame and then chooses an action in response to the event, which affects the duration of…
We study the scheduling of jobs on a single parallel-batching machine with non-identical job sizes and incompatible job families. Jobs from the same family have the same processing time and can be loaded into a batch, as long as the batch…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
The Grid technology is evolving into a global, service-orientated architecture, a universal platform for delivering future high demand computational services. Strong adoption of the Grid and the utility computing concept is leading to an…
One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm for this problem guarantees an approximation…
As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and…
We consider the scheduling problem on $n$ strategic unrelated machines when no payments are allowed, under the objective of minimizing the makespan. We adopt the model introduced in [Koutsoupias, Theory Comput. Syst. (2014)] where a machine…
During the execution of a job, it may suspend itself, i.e., its computation ceases to process until certain activities are complete to be resumed. This paper provides a counterexample of the schedulability analysis by Devi in Euromicro…
This paper considers the resource-constrained project scheduling problem with uncertain activity durations. We assume that activity durations lie in a budgeted uncertainty set, and follow a robust two-stage approach, where a decision maker…
We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with…
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
A notion of alternating timed automata is proposed. It is shown that such automata with only one clock have decidable emptiness problem over finite words. This gives a new class of timed languages which is closed under boolean operations…
A multiple server setting is considered, where each server has tunable speed, and increasing the speed incurs an energy cost. Jobs arrive to a single queue, and each job has two types of sub-tasks, map and reduce, and a {\bf precedence}…