Related papers: The commissioning phase
The Five-hundred-meter Aperture Spherical radio Telescope (FAST) was completed with its main structure installed on September 25, 2016, after which it entered the commissioning phase. This paper aims to introduce the commissioning progress…
In the period 2012 June - 2013 October, the Sardinia Radio Telescope (SRT) went through the technical commissioning phase. The characterization involved three first-light receivers, ranging in frequency between 300MHz and 26GHz, connected…
Negotiations began 1n 1968 for a telescope facility at Perth Observatory for NASA's International Planetary Patrol Network. 1,000 days later the telescope saw first light. The facility bears no resemblance to other observatories. Inside a…
This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and…
The 4m International Liquid Mirror Telescope (ILMT) is a zenith-pointing optical observing facility at ARIES Devasthal observatory (Uttarakhand, India). The first light preparatory activities of the ILMT were accomplished in April 2022…
The Five-hundred-meter Aperture Spherical radio Telescope (FAST) is by far the largest telescope of any kind ever built. FAST produced its first light in September 2016 and it is now under commissioning, with normal operation to commence in…
To meet the scientific goals of the Thirty Meter Telescope Project, full diffraction-limited performance is required from the outset and hence the entire observatory is being designed, as a system, to achieve this. The preliminary design…
The Ultraviolet Imaging Telescope (UIT) was flown as part of the Astro observatory on the Space Shuttle Columbia in December 1990 and again on the Space Shuttle Endeavor in March 1995. Ultraviolet (1200-3300 Angstroms) images of a variety…
Robo-AO is the first autonomous laser adaptive optics system and science instrument operating on sky. With minimal human oversight, the system robotically executes large scale surveys, monitors long-term astrophysical dynamics and…
We present the first results of the site testing performed at Mt.~Shatdzhatmaz at Northern Caucasus, where the new Sternberg astronomical institute 2.5-m telescope will be installed. An automatic site monitor instrumentation and…
2011 was a successful year for the GREGOR project. The telescope was finally completed in May with the installation of the 1.5-meter primary mirror. The installation of the first-light focal plane instruments was completed by the end of the…
The first Large Size Telescope (LST-1) of the Cherenkov Telescope Array has been operational since October 2018 at La Palma, Spain. We report on the results obtained during the camera commissioning. The noise level of the readout is…
Herschel was launched on 14 May 2009, and is now an operational ESA space observatory offering unprecedented observational capabilities in the far-infrared and submillimetre spectral range 55-671 {\mu}m. Herschel carries a 3.5 metre…
We present a coordinated campaign of observations to monitor the brightness of the James Webb Space Telescope (JWST) as it travels toward the second Earth-Sun Lagrange point and unfolds using the network ofUnistellar digital telescopes.…
The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The sub-detector integration in recent milestone weeks is described. Cosmic commissioning in milestone week M6 included simultaneous data-taking and…
The Large Area Telescope (LAT) on-board the Fermi Gamma-ray Space Telescope started nominal operations on August 13, 2008, after about 60 days of instrument checkout and commissioning and is currently performing an all-sky gamma-ray survey…
[Abridged] The Sardinia Radio Telescope (SRT) is the new 64-m dish operated by INAF (Italy). Its active surface will allow us to observe at frequencies of up to 116 GHz. At the moment, three receivers, one per focal position, have been…
The recently commissioned 3.6-m Devasthal optical telescope has been used for various tests and science observations using three main instruments, namely, a charge-coupled device camera, a near-infrared camera, and an optical…
We reported the photometric calibration of Lunar-based Ultraviolet telescope (LUT), the first robotic astronomical telescope working on the lunar surface, for its first six months of operation on the lunar surface. Two spectral datasets…
The first atmospheric Cherenkov telescope of VERITAS (the Very Energetic Radiation Imaging Telescope Array System) has been in operation since February 2005. We present here a technical description of the instrument and a summary of its…