Related papers: Verification Testing of MQXFA Nb3Sn Wires Procured…
Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb3Sn low-\b{eta} MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC…
The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the…
By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low beta quadrupole magnets to be used in the Q1 and Q3 Inner…
The maximum magnetic field available to guide and focus the proton beams will be the most important factor driving the design of the High Energy LHC. The US LHC Accelerator Research Program (LARP) is a collaboration of US National…
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two…
The purpose of this document is to define the specifications for the structure fabrication and assembly of MQXFA series magnets to be used by the US High-Luminosity LHC Accelerator Upgrade Project (AUP). Magnets fabricated according to…
LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to…
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S.…
MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the US Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and…
The US will be contributing to the HL-LHC upgrade at CERN with the fabrication and qualification of RFD crabbing cavities in the framework of the HL-LHC Accelerator Upgrade Project (AUP) managed by Fermilab. AUP received Critical Decision 3…
The design and production of Nb3Sn-based dipole and quadrupole magnets is critical for the realization of the High-Luminosity Large Hadron Collider (HL-LHC) at the European Organization for Nuclear Research (CERN). Nb3Sn superconducting…
The Muon Accelerator Program (MAP) has completed a four-year study on the feasibility of muon colliders and on using stored muon beams for neutrinos. That study was broadly successful in its goals, establishing the feasibility of heavy…
The MQXFA Quadrupole magnets will be installed in High Luminosity LHC to form the Q1 and Q3 inner triplet optical elements in front of the interaction points 1 (ATLAS) and 5 (CMS). A pair of MQXFA units is assembled in a stainless steel…
A major problem of state-of-the-art Nb$_3$Sn accelerator magnets is their long training due to thermo-mechanical perturbations. Increasing the specific heat, $C_p$, of the Rutherford cable would reduce and/or eliminate training by limiting…
The high-luminosity LHC upgrade requires stronger than LHC low-beta quadrupole magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs…
MQXC is a Nb-Ti quadrupole designed to meet the accelerator quality requirements needed for the phase-1 LHC upgrade, now superseded by the high luminosity upgrade foreseen in 2021. The 2-m-long model magnet was tested at room temperature…
New accelerator magnet technology based on Nb3Sn superconductor is being developed at Fermilab since late 90's. Six short dipole models, seven short quadrupole models and numerous individual dipole and quadrupole coils have been built and…
Development of REBCO cables that carry high electrical current in high magnetic field is crucial for future large-scale magnet applications. This experimental work presents the critical current measurements of two different REBCO cables by…
KEK and NIMS have been jointly developing Nb3Al superconducting wire with a rapid heating and quenching (RHQ) method towards high field accelerator magnets in the Large Hadron Collider (LHC) luminosity upgrade. A15-type superconductors such…
Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background…