Related papers: Improved Approximations for Unrelated Machine Sche…
We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…
Motivated by settings such as medical treatments or aircraft maintenance, we consider a scheduling problem with jobs that consist of two operations, a test and a processing part. The time required to execute the test is known in advance…
We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…
We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with…
In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
Malleable scheduling is a model that captures the possibility of parallelization to expedite the completion of time-critical tasks. A malleable job can be allocated and processed simultaneously on multiple machines, occupying the same time…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
There is a long history of approximation schemes for the problem of scheduling jobs on identical machines to minimize the makespan. Such a scheme grants a $(1+\epsilon)$-approximation solution for every $\epsilon > 0$, but the running time…
This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the…
Many optimization and scheduling problems can be abstracted in terms of a bipartite ``assignment graph" $G = (L \cup R, E)$, where the goal is to select exactly one edge for each right-node. For example, a right-node may correspond to a…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
We study LP-rounding approximation algorithms for metric uncapacitated facility-location problems. We first give a new analysis for the algorithm of Chudak and Shmoys, which differs from the analysis of Byrka and Aardal in that now we do…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
Recently, the problem of multitasking scheduling has attracted a lot of attention in the service industries where workers frequently perform multiple tasks by switching from one task to another. Hall, Leung and Li (Discrete Applied…
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
In this paper, we introduce a new online scheduling framework for minimizing total weighted completion time in a general setting. The framework is inspired by the work of Hall et al. [Mathematics of Operations Research, Vol 22(3):513-544,…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
The input to the Multiway Cut problem is a weighted undirected graph, with nonnegative edge weights, and $k$ designated terminals. The goal is to partition the vertices of the graph into $k$ parts, each containing exactly one of the…