Related papers: On Minimizing Tardy Processing Time, Max-Min Skewe…
While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…
We consider the classical minimum makespan scheduling problem, where the processing time of job $j$ on machine $i$ is $p_{ij}$, and the matrix $P=(p_{ij})_{m\times n}$ is of a low rank. It is proved in (Bhaskara et al., SODA 2013) that rank…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
This paper presents a novel idea for the general case of the Common Due-Date (CDD) scheduling problem. The problem is about scheduling a certain number of jobs on a single or parallel machines where all the jobs possess different processing…
We consider the classical problem of minimizing the total weighted flow-time for unrelated machines in the online \emph{non-clairvoyant} setting. In this problem, a set of jobs $J$ arrive over time to be scheduled on a set of $M$ machines.…
We investigate the global scheduling of sporadic, implicit deadline, real-time task systems on multiprocessor platforms. We provide a task model which integrates job parallelism. We prove that the time-complexity of the feasibility problem…
A distributed network is modeled by a graph having $n$ nodes (processors) and diameter $D$. We study the time complexity of approximating {\em weighted} (undirected) shortest paths on distributed networks with a $O(\log n)$ {\em bandwidth…
We consider the problem of online scheduling on a single machine in order to minimize weighted flow time. The existing algorithms for this problem (STOC '01, SODA '03, FOCS '18) all require exact knowledge of the processing time of each…
The Moore-Hodgson Algorithm minimizes the number of late jobs on a single machine. That is, it finds an optimal schedule for the classical problem $1~|\;|~\sum{U_j}$. Several proofs of the correctness of this algorithm have been published.…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
Scheduling jobs with precedence constraints on a set of identical machines to minimize the total processing time (makespan) is a fundamental problem in combinatorial optimization. In practical settings such as cloud computing, jobs are…
Makespan scheduling on identical machines is one of the most basic and fundamental packing problems studied in the discrete optimization literature. It asks for an assignment of $n$ jobs to a set of $m$ identical machines that minimizes the…
A fundamental problem in shape matching and geometric similarity is computing the maximum area overlap between two polygons under translation. For general simple polygons, the best-known algorithm runs in $O((nm)^2 \log(nm))$ time [Mount,…
We investigate the recoverable robust single machine scheduling problem under interval uncertainty. In this setting, jobs have first-stage processing times p and second-stage processing times q and we aim to find a first-stage and…
We discuss one of the most fundamental scheduling problem of processing jobs on a single machine to minimize the weighted flow time (weighted response time). Our main result is a $O(\log P)$-competitive algorithm, where $P$ is the…
An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…
Motivated by the need of quick job (re-)scheduling, we examine an elaborate scheduling environment under the objective of total weighted tardiness minimization. The examined problem variant moves well beyond existing literature, as it…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
We revisit the complexity of the classical Interval Scheduling in the dynamic setting. In this problem, the goal is to maintain a set of intervals under insertions and deletions and report the size of the maximum size subset of pairwise…