Related papers: Experience With Machine Protection Systems At PIP2…
The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main…
The potentially realizable beam power at the Fermilab long-baseline neutrino program has motivated a reinvigorated design and optimization effort for a rapid-cycling synchrotron (RCS) intensity upgrade of the Fermilab proton complex. We…
A longitudinal beam properties, data acquisition system has been commissioned to operate in the Fermilab booster ring. This system captures real time information including beam synchronous phase, bunch length, and coupled bunch instability…
Active Pixel Sensor (APS) technology has shown promise for next-generation vertex detectors. This paper discusses the design and testing of two generations of APS chips. Both are arrays of 128 by 128 pixels, each 20 by 20 micro-m. Each…
Part-3 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". The proposed Project X proton accelerator at Fermilab, with multi-MW beam power and highly versatile beam formatting, will be a unique world-class…
Recently the Chinese Academy of Sciences has chosen BEPCII as the future development of the BEPC, i.e. upgrade of both the machine and detector. The luminosity of the machine is expected to increase to 1.0x1033cm-2s-1. The project will be…
The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150…
The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for beam loss monitors (BLM)[2], which provided a more…
Further progress in building high-granular large-scale systems based on Scintillation Tiles with MRS APD light readout (START) became possible thanks to the creation of an improved version of MRS APD. The cost of the system may now be…
A monolithic silicon pixel ASIC prototype, produced in 2024 as part of the Horizon 2020 MONOLITH ERC Advanced project, was tested with a 120 GeV/c pion beam. The ASIC features a matrix of hexagonal pixels with a 100 \mu m pitch, read by…
We describe the physics capabilites and status of the MIPP experiment which is scheduled to enter its physics data taking period during December 2004-July 2005. We show some of the results obtained from the engineering run that concluded in…
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast…
A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly…
A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in…
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and…
The use of existing Fermilab facilities to provide beams for two muon experiments -- the Muon to Electron Conversion Experiment (Mu2e) and the New g-2 Experiment -- is under consideration. Plans are being pursued to perform these…
With the growing availability of machine-learned interatomic potential (MLIP) models for materials simulations, there is an increasing demand for robust, automated, and chemically insightful benchmarking methodologies. In response, we here…
The apparatus of the ALICE experiment at CERN will be upgraded in 2017/18 during the second long shutdown of the LHC (LS2). A major motivation for this upgrade is to extend the physics reach for charmed and beauty particles down to low…
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration…
A laser-Compton backscattering beam, which we call a `Laser-Electron Photon' beam, was upgraded at the LEPS beamline of SPring-8. We accomplished the gains in backscattered photon beam intensities by factors of 1.5--1.8 with the injection…