The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H$^-$ linac, christened Linac2, that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and…
The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection…
With the planned turn-on of the PIP-II 800 MeV superconducting proton linac, Fermilab will potentially become the world's best laboratory at which to carry out fundamental muon measurements, sensitive searches for symmetry violation, and…
Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the…
PIP-II is a superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an RFQ and buncher cavities along with 25 superconducting cryo-modules…
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the…
PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting…
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…
The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighbouring Beam Position Monitors (BPMs). This report discusses implementation of such a procedure at the PIP-II H- linac being constructed…
The first phase of the HIE-ISOLDE project at CERN consists of a superconducting (SC) linac upgrade in order to increase the energy of post-accelerated radioactive ion beams from 2.8 MeV/u to over 10 MeV/u (for A/q = 4.5). In preparation for…
The superconducting (SC) High Intensity and Energy (HIE) ISOLDE linac will replace most of the existing accelerating infrastructure of the Radioactive ion beam EXperiment (REX) at CERN, however, the 101.28 MHz RFQ and 5 MV IH cavity will…
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under…
Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was…
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into…
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the…