The subject of Job Scheduling Optimisation (JSO) deals with the scheduling of jobs in an organization, so that the single working steps are optimally organized regarding the postulated targets. In this paper a use case is provided which…
This paper considers a stochastic production planning problem with regime switching. There are two regimes corresponding to different economic cycles. A factory is planning its production so as to minimize production costs. We analyze this…
In modern computing systems, jobs' resource requirements often vary over time. Accounting for this temporal variability during job scheduling is essential for meeting performance goals. However, theoretical understanding on how to schedule…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
In the past few years, we have envisioned an increasing number of businesses start driving by big data analytics, such as Amazon recommendations and Google Advertisements. At the back-end side, the businesses are powered by big data…
Today's global supply chains face growing challenges due to rapidly changing market conditions, increased network complexity and inter-dependency, and dynamic uncertainties in supply, demand, and other factors. To combat these challenges,…
Automating large-scale manufacturing in domains like timber construction requires multi-robot systems to manage tightly coupled spatiotemporal constraints, such as collision avoidance and process-driven deadlines. This paper introduces…
This paper addresses the stabilization problem of stochastic jump systems (SJSs) closed by a generally sampled controller. Because of the controller's switching and state both sampled, it is challenging to study its stabilization. A new…
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched.…
In this work, we study the single machine scheduling problem with uncertain release times and processing times of jobs. We adopt a robust scheduling approach, in which the measure of robustness to be minimized for a given sequence of jobs…
We study heuristic algorithms for job shop scheduling problems. We compare classical approaches, such as the shifting bottleneck heuristic with novel strategies using decision diagrams. Balas' local refinement is used to improve feasible…
This paper presents two stochastic optimization approaches for simultaneous project scheduling and personnel planning, extending a deterministic model previously developed by Heimerl and Kolisch. For the problem of assigning work packages…
This paper studies a model for online job scheduling in green datacenters. In green datacenters, resource availability depends on the power supply from the renewables. Intermittent power supply from renewables leads to intermittent resource…
To improve the utility of learning applications and render machine learning solutions feasible for complex applications, a substantial amount of heavy computations is needed. Thus, it is essential to delegate the computations among several…
In a task where many similar inverse problems must be solved, evaluating costly simulations is impractical. Therefore, replacing the model $y$ with a surrogate model $y_s$ that can be evaluated quickly leads to a significant speedup. The…
In this paper we consider a combination of the joint replenishment problem (JRP) and single machine scheduling with release dates. There is a single machine and one or more item types. Each job has a release date, a positive processing…
In industrial resource allocation problems, an initial planning stage may solve a nominal problem instance and a subsequent recovery stage may intervene to repair inefficiencies and infeasibilities due to uncertainty, e.g.\ machine failures…
We extend the stochastic production planning framework to manufacturing systems, where the set of admissible production configurations is described by a general smooth convex domain $\omega $. In our setting, production operations continue…
Efficient job-shop scheduling with transportation resources is critical for high-performance manufacturing. With the rise of "decentralized factories", multi-agent reinforcement learning has emerged as a promising approach for the combined…