Unit maintenance and unit commitment are two critical and interrelated aspects of electric power system operation, both of which face the challenge of coordinating efforts to enhance reliability and economic performance. This challenge…
Two-stage robust unit commitment (RUC) models have been widely used for day-ahead energy and reserve scheduling under high renewable integration. The current state of the art relies on budget-constrained polyhedral uncertainty sets to…
The deep penetration of wind and solar power is a critical component of the future power grid. However, the intermittency and stochasticity of these renewable resources bring significant challenges to the reliable and economic operation of…
Optimization models have been broadly used within side the energy industry as useful decision-making systems for scheduling and dispatching electric powered energy resources; this is applied in a system called unit commitment (UC). Unit…
The joint management of heat and power systems is believed to be key to the integration of renewables into energy systems with a large penetration of district heating. Determining the day-ahead unit commitment and production schedules for…
This paper addresses two vital issues which are barely discussed in the literature on robust unit commitment (RUC): 1) how much the potential operational loss could be if the realization of uncertainty is beyond the prescribed uncertainty…
To enhance the reliability of Integrated Energy Systems (IESs) and address the research gap in reliability-based planning methods, this paper proposes a two-stage robust planning model specifically for park-level IESs. The proposed planning…
This paper proposes a reformulation of the scenario-based two-stage unit commitment problem under uncertainty that allows finding unit-commitment plans that perform reasonably well both in expectation and for the worst case realization of…
This paper addresses a central challenge of jointly considering shorter-term (e.g. hourly) and longer-term (e.g. yearly) uncertainties in power system planning with increasing penetration of renewable and storage resources. In conventional…
Day-ahead scheduling of electricity generation or unit commitment is an important and challenging optimization problem in power systems. Variability in net load arising from the increasing penetration of renewable technologies have…
Maintaining instantaneous balance between electricity supply and demand is critical for reliability and grid instability. System operators achieve this through solving the task of Unit Commitment (UC),ca high dimensional large-scale…
In the face of extreme events, e.g., hurricanes, the transmission systems, especially the transmission lines, are affected across time and space. To mitigate these impacts on the day-ahead market from a probabilistic perspective, a…
The growing uncertainty from renewable power and electricity demand brings significant challenges to unit commitment (UC). While various advanced forecasting and optimization methods have been developed to predict better and address this…
We consider a two-stage robust facility location problem on a metric under an uncertain demand. The decision-maker needs to decide on the (integral) units of supply for each facility in the first stage to satisfy an uncertain second-stage…
Due to the established energy production methods contribution to the climate crisis, renewable energy is to replace a substantial part of coal or nuclear plants to prevent greenhouse gases or toxic waste entering the atmosphere. This…
The deepening penetration of renewable resources into power systems entails great difficulties that have not been surmounted satisfactorily. An issue that merits special attention is the short-term planning of power systems under net load…
We propose a new algorithm for the solution of the robust multiple-load topology optimization problem. The algorithm can be applied to any type of problem, e.g., truss topology, variable thickness sheet or free material optimization. We…
Design under uncertainty is a challenging problem, as a systems performance can be highly sensitive to variations in input parameters and model uncertainty. A conventional approach to addressing such problems is robust optimization, which…
This paper addresses the transmission network expansion planning problem under uncertain demand and generation capacity. A two-stage adaptive robust optimization framework is adopted whereby the worst-case operating cost is accounted for…
Gas-fired generators, with their ability to quickly ramp up and down their electricity production, play an important role in managing renewable energy variability. However, these changes in electricity production translate into variability…