The problem of attaining energy efficiency in distributed systems is of importance, but a general, non-domain-specific theory of energy-minimal scheduling is far from developed. In this paper, we classify the problems of energy-minimal…
We consider the offline sorting buffer problem. The input is a sequence of items of different types. All items must be processed one by one by a server. The server is equipped with a random-access buffer of limited capacity which can be…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
Despite major advancements in nonlinear programming (NLP) and convex relaxations, most system operators around the world still predominantly use some form of linear programming (LP) approximation of the AC power flow equations. This is…
Onsite Job Scheduling is a specialized variant of Vehicle Routing Problem (VRP) with multiple depots. The objective of this problem is to execute jobs requested by customers, belonging to different geographic locations by a limited number…
This paper considers the problem of scheduling a single batch processing machine such that the total number of tardy jobs is minimized. The machine can simultaneously process several jobs as a batch as long as the machine capacity is not…
The subject of Job Scheduling Optimisation (JSO) deals with the scheduling of jobs in an organization, so that the single working steps are optimally organized regarding the postulated targets. In this paper a use case is provided which…
This paper introduces the \emph{serial-parallel decision problem}. Consider an online scheduler that receives a series of tasks, where each task has both a parallel and a serial implementation. The parallel implementation has the advantage…
We study a scheduling problem arising in demand response management in smart grid. Consumers send in power requests with a flexible feasible time interval during which their requests can be served. The grid controller, upon receiving power…
Modern semiconductor manufacturing involves intricate production processes consisting of hundreds of operations, which can take several months from lot release to completion. The high-tech machines used in these processes are diverse,…
Constraint Programming (CP) is a declarative programming paradigm that allows for modeling and solving combinatorial optimization problems, such as the Job-Shop Scheduling Problem (JSSP). While CP solvers manage to find optimal or…
The NP-hard problem of task scheduling with communication delays (P|prec,c_{ij}|C_{\mathrm{max}}) is often tackled using approximate methods, but guarantees on the quality of these heuristic solutions are hard to come by. Optimal schedules…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
Consumer-electronics systems are becoming increasingly complex as the number of integrated applications is growing. Some of these applications have real-time requirements, while other non-real-time applications only require good average…
We consider several combinatorial optimization problems which combine the classic shop scheduling problems, namely open shop scheduling or job shop scheduling, and the shortest path problem. The objective of the obtained problem is to…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
Phasor Measurement Units (PMUs) are essential measuring devices for monitoring, control and protection of power systems. The objective of the optimal PMU placement (OPP) problem is to minimize the number of PMUs and select the bus locations…
A mathematical programming model for a class of single machine family scheduling problem is described in this technical report, with the aim of comparing the performance in solving the scheduling problem by means of mathematical programming…