Related papers: Design Considerations for Fermilab Multi-MW Proton…
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac…
The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment…
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the…
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…
DUNE/LBNF constitutes an international multi-decadal physics program for leading-edge neutrino science and proton decay studies [1] and is expected to serve as the flagship particle experiment based at Fermilab.
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…
The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam…
The Proton Improvement Plan (PIP-II) to the FNAL accelerator chain and the Long-Baseline Neutrino Facility (LBNF) will provide the world's most intense neutrino beam to the Deep Underground Neutrino Experiment (DUNE) enabling a wide-ranging…
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…
The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H$^-$ linac, christened Linac2, that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and…
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a…
Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was…
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such…
The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the…
Significant upgrades to Fermilab's accelerator complex have accompanied the development of LBNF (the Long Baseline Neutrino Facility) and DUNE (Deep Underground Neutrino Experiment). These improvements will facilitate 1-MW operation of the…
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice…
The next generation of high-energy physics experiments requires high intensity protons in the multi-GeV energy range for efficient production of secondary beams. The Fermilab long-term future requires an 8 GeV proton source to feed the Main…
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors,…