Related papers: A Bi-Criteria FPTAS for Scheduling with Memory Con…
The Capacitated Vehicle Routing problem is to find a minimum-cost set of tours that collectively cover clients in a graph, such that each tour starts and ends at a specified depot and is subject to a capacity bound on the number of clients…
In Polyamorous Scheduling, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard…
We study three two-stage optimization problems with a similar structure and different objectives. In the first stage of each problem, the goal is to assign input jobs of positive sizes to unsplittable bags. After this assignment is decided,…
Dynamic programming over tree decompositions is a common technique in parameterized algorithms. In this paper, we study whether this technique can also be applied to compute Pareto sets of multiobjective optimization problems. We first…
Treewidth is a useful tool in designing graph algorithms. Although many NP-hard graph problems can be solved in linear time when the input graphs have small treewidth, there are problems which remain hard on graphs of bounded treewidth. In…
Short spanning trees subject to additional constraints are important building blocks in various approximation algorithms. Especially in the context of the Traveling Salesman Problem (TSP), new techniques for finding spanning trees with…
We study "space efficient" FPT algorithms for graph problems with limited memory. Let n be the size of the input graph and k be the parameter. We present algorithms that run in time f(k)*poly(n) and use g(k)*polylog(n) working space, where…
As the gap between compute and I/O performance tends to grow, modern High-Performance Computing (HPC) architectures include a new resource type: an intermediate persistent fast memory layer, called burst buffers. This is just one of many…
We study the scheduling of jobs on a single parallel-batching machine with non-identical job sizes and incompatible job families. Jobs from the same family have the same processing time and can be loaded into a batch, as long as the batch…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
Several variants of the Constraint Satisfaction Problem have been proposed and investigated in the literature for modelling those scenarios where solutions are associated with some given costs. Within these frameworks computing an optimal…
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are…
Subgraph counting aims to count the occurrences of a subgraph template T in a given network G. The basic problem of computing structural properties such as counting triangles and other subgraphs has found applications in diverse domains.…
In this work we consider two two-criteria optimization problems: given an input graph, the goal is to find its interval (or chordal) supergraph that minimizes the number of edges and its clique number simultaneously. For the interval…
We introduce a series of graph decompositions based on the modulator/target scheme of modification problems that enable several algorithmic applications that parametrically extend the algorithmic potential of planarity. In the core of our…
We give the first polynomial-time approximation scheme (PTAS) for the Steiner forest problem on planar graphs and, more generally, on graphs of bounded genus. As a first step, we show how to build a Steiner forest spanner for such graphs.…
This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio.…