Related papers: A polynomial-time approximation scheme for paralle…
The world is dynamic and changes over time, thus any optimization problem used to model real life problems must address this dynamic nature, taking into account the cost of changes to a solution over time. The multistage model was…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
We consider the product knapsack problem, which is the variant of the classical 0-1 knapsack problem where the objective consists of maximizing the product of the profits of the selected items. These profits are allowed to be positive or…
In this paper, we propose a general framework to design {efficient} polynomial time approximation schemes (EPTAS) for fundamental stochastic combinatorial optimization problems. Given an error parameter $\epsilon>0$, such algorithmic…
We give a deterministic, polynomial-time algorithm for approximately counting the number of {0,1}-solutions to any instance of the knapsack problem. On an instance of length n with total weight W and accuracy parameter eps, our algorithm…
We study the incremental knapsack problem, where one wishes to sequentially pack items into a knapsack whose capacity expands over a finite planning horizon, with the objective of maximizing time-averaged profits. While various…
In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…
We propose a Fully Polynomial-Time Approximation Scheme (FPTAS) for stochastic dynamic programs with multidimensional action, scalar state, convex costs and linear state transition function. The action spaces are polyhedral and described by…
We develop a general framework for designing polynomial-time approximation schemes (PTASs) for various vehicle routing problems in trees. In these problems, the goal is to optimally route a fleet of vehicles, originating at a depot, to…
We consider the following single-machine scheduling problem, which is often denoted $1||\sum f_{j}$: we are given $n$ jobs to be scheduled on a single machine, where each job $j$ has an integral processing time $p_j$, and there is a…
The subject of this paper is the time complexity of approximating Knapsack, Subset Sum, Partition, and some other related problems. The main result is an $\widetilde{O}(n+1/\varepsilon^{5/3})$ time randomized FPTAS for Partition, which is…
With the rapid advancement of technology, parallel computing applications have become increasingly popular and are commonly executed in large data centers. These applications involve two phases: computation and communication, which are…
Given $n$ independent random variables $X_1, X_2, ..., X_n$ and an integer $C$, we study the fundamental problem of computing the probability that the sum $X=X_1+X_2+...+X_n$ is at most $C$. We assume that each random variable $X_i$ is…
We develop a framework for obtaining polynomial time approximation schemes (PTAS) for a class of stochastic dynamic programs. Using our framework, we obtain the first PTAS for the following stochastic combinatorial optimization problems:…
The effect of resource allocation on manufacturing motivates us to examine a scheduling variant that is of practical significance yet remains overlooked. We examine a Hybrid Flexible Flowshop (HFFS), i.e., an environment where a set of jobs…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
In the present scenario the recent engineering and industrial built-up units are facing hodgepodge of problems in a lot of aspects such as machining time, electricity, man power, raw material and customers constraints. The job-shop…
In the $2$-Machine Flow Shop problem with exact delays the operations of each job are separated by a given time lag (delay). Leung et al. (2007) established that the problem is strongly NP-hard when the delays may have at most two different…
The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…